My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2009 4:43:07 PM
Creation date
2/11/2009 4:35:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The after-caze programs appeals to families who request special tutoring for their <br />children. Emphasis is placed upon reading, English skills, mathematics, and learning the <br />Chinese language. The program has successfully operated for the past two years without <br />any complaints from the community or the Santa Rita Office Center Association. <br />Staff consists of six teachers and assistants who monitor a close contact environment with <br />each child. Children remain indoors throughout their stay. <br />Impact of this Proposed Change: <br />By-in-lazge, the approved operation noted on May 1 Q 2006 remains the same. The only <br />difference will be the increased size of the facility and the drop-off/pick-up location. <br />The number of children approved in PCUP-166 remains the same: 32 for <br />Pleasanton Community Church and 25 for the Little Ivy League Tutoring <br />program. All share the 6480 sq. ft. space, which is also divided up into 5 <br />classrooms (see site diagram). <br />Children's drop off and pick up will be on the Santa Rita side (west side of <br />the complex). There is virtually no traffic on this west side of the <br />complex. Students aze brought from six different elementary schools in <br />Pleasanton by school vans and dropped off at the location. Pazents pick up <br />their children between the hours of 4:00 p.m. and 6:30 p.m. <br />The Santa Rita Office Center contains a total of 223 parking spaces. <br />There aze currently 29 nondesignated spaces on the west side of 4439 <br />which aze available for parking throughout the day; none of which <br />interfere with the other usages of the complex. More spaces are available <br />throughout the complex if needed, including 8 spaces on the east side of <br />4439. <br />• Children will meet in the church sanctuary area, located on the fast floor. <br />This building meets all city regulations for Sunday worship attendance. <br />The new building size is 6480 sq. ft. The former amount of space being <br />used in Building 4455 was approximately 3000 sq. ft. <br />• Five new classrooms will be constructed within the 44391ocation; this is <br />the same number of classrooms used in Building 4455. <br />• Please see attached maps and diagrams. <br />Approval for the Santa Rita Office Center Association: <br />Approval was granted on November 27, 2007 with the following <br />stipulations: <br />
The URL can be used to link to this page
Your browser does not support the video tag.