Laserfiche WebLink
CORNERSTONE <br />C. EARTH GROUP <br />The vertical capacity of the piers may be designed based on an allowable skin friction of 500 psf <br />for combined dead plus live loads based on a factor of safety of 2.0; dead loads should not <br />exceed two-thirds of the allowable capacities. The allowable skin friction may be increased by <br />one-third for wind and seismic loads. Frictional resistance to uplift loads may be developed <br />along the pier shafts based on an ultimate frictional resistance of 600 psf; the structural <br />engineer should apply an appropriate factor of safety (such as 1.5) to the ultimate uplift <br />capacity. <br />Total settlement of individual piers should not exceed % inch to mobilize static capacities and <br />post-construction differential settlement between adjacent piers should not exceed'/, inch due <br />to static loads. <br />7.3.2 Lateral Capacity <br />Lateral loads exerted on the structure may be resisted by a passive resistance based on an <br />ultimate equivalent fluid pressure of 450 psf acting against twice the projected area of piers <br />below the grade beam, up to a maximum uniform pressure of 2,500 psf at depth. The upper 12 <br />inches of soil should be neglected when determining lateral capacity. The structural engineer <br />should apply an appropriate factor of safety to the ultimate passive pressures. <br />7.3.3 Construction Considerations <br />The excavation of all drilled shafts should be observed by a Cornerstone representative to <br />confirm the soil profile and observe that the piers are constructed in accordance with our <br />recommendations and project requirements. The drilled shafts should be straight, dry, and <br />relatively free of loose material before reinforcing steel is installed and concrete is placed. If <br />perched ground water is encountered that cannot be removed from the excavations prior to <br />concrete placement, the concrete should be placed using a tremie pipe, keeping the tremie pipe <br />below the surface of the concrete to avoid entrapment of water in the concrete. Due to the <br />loose nature of some of the cleaner sand layers, the use of temporary casing of each drilled <br />shaft may be required if caving soil conditions are encountered. <br />SECTION 8: CONCRETE SLABS AND PEDESTRIAN PAVEMENTS <br />8.1 EXTERIOR FLATWORK <br />8.1.1 Pedestrian Concrete Flatwork <br />Exterior concrete flatwork subject to pedestrian and/or occasional light pickup loading should <br />be at least 4 inches thick and supported directly upon subgrade prepared in accordance with the <br />"Earthwork" recommendations of this report. Flatwork that will be subject to heavier or frequent <br />vehicular loading should be designed in accordance with the recommendations in the "Vehicular <br />Pavements" section below. To help reduce the potential for uncontrolled shrinkage cracking, <br />adequate expansion and control joints should be included. Consideration should be given to <br />limiting the control joint spacing to a maximum of about 2 feet in each direction for each inch of <br />concrete thickness. Flatwork should be isolated from adjacent foundations or retaining walls <br />Ponderosa Active Adult Community Page 20 <br />132-2-1 <br />