My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
09 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:44 PM
Creation date
2/12/2009 4:35:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORNERSTONE <br />C. EARTH GROUP <br />These guidelines are based on information obtained from a variety of sources, including the <br />American Concrete Institute (ACI) and are intended to reduce the potential for moisture-related <br />problems causing floor covering failures, and may be supplemented as necessary based on <br />project-specific requirements. The application of these guidelines or not will not affect the <br />geotechnical aspects of the mat foundation performance. <br />Place a minimum 10-mil thick vapor retarder conforming to ASTM E 1745, Class C <br />requirements or better directly below the concrete mat; the vapor retarder should extend <br />to within 12 to 18 inches from the mat edges and be sealed at all seams and <br />penetrations in accordance with manufacturer's recommendations and ASTM E 1643 <br />requirements. A 4-inch-thick capillary break, consisting of Yz- to 3/<-inch crushed rock <br />with less than 5 percent passing the No. 200 sieve, should be placed below the vapor <br />retarder and consolidated in place with vibratory equipment. At your option, the section <br />of crushed rock could be reduced to no less than 2 inches, but would not be as <br />beneficial as the 4 inches suggested above. <br />• The concrete water:cement ratio should be 0.45 or less. Mid-range plasticizers may be <br />used to increase concrete workability and facilitate pumping and placement. <br />• Water should not be added after initial batching unless the slump is less than specified <br />and/or the resulting water:cement ratio will not exceed 0.45. <br />j Polishing the concrete surface with metal trowels should not be allowed versus light <br />`_ broom or limited trowel finishing. <br />^ Where floor coverings are planned, all concrete surfaces should be moist cured (kept <br />continuously wet) for at least 7 days by soaking burlap, cotton mats, or carpet, or <br />frequent sprinkling. The moist cure method should be placed as soon after concrete <br />finishing as possible, while resisting surface damage. Chemical curing may bean option <br />depending on the floor covering type. <br />^ Water vapor emission levels and concrete pH should be determined in accordance with <br />ASTM F1869-98 and F710-98 requirements and evaluated against the floor covering <br />manufacturer's requirements prior to installation. <br />7.3 DRILLED PIERS <br />7.3.1 Vertical Capacity and Settlement <br />Any proposed sound walls may be supported on drilled, cast-in-place, straight-shaft friction <br />piers. The piers should have a minimum diameter of 12 inches and extend to a depth of at least <br />5 feet below the bottom of the grade beams or lowest adjacent finished grade, whichever is <br />greater. Adjacent piers centers should be spaced at least three diameters apart, otherwise, a <br />reduction for group effects may be required. Grade beams should span between piers and/or <br />pier caps in accordance with structural requirements. <br />Ponderosa Active Adult Community Page 19 <br />132-2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.