My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
09 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:44 PM
Creation date
2/12/2009 4:35:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The traffic study analyzed the weekday a.m. and p.m. peak hour LOS traffic for the following <br />three scenarios: <br />• Existing -This scenario evaluates the existing traffic conditions. <br />• Existing Plus Approved Projects -This scenario includes the existing traffic plus traffic <br />from approved but not yet built/completed projects. <br />• Existing Plus Approved Projects Plus the Proposed Project -This scenario includes the <br />existing traffic, plus traffic from approved but not yet built/completed projects, plus <br />traffic from the proposed project. <br />The proposed 110-unit detached single-family homes for residents aged 55 years and older <br />would generate approximately 587 daily trips on an average weekday, including a total of 30 <br />AM peak hour trips (11 trips inbound and 19 trips outbound) and 53 PM peak hour trips (32 <br />inbound and 21 trips outbound). <br />Seven intersections were analyzed in the traffic study based on the number of trips that the <br />project adds to the intersections and the existing level of service (LOS) at the intersections. All <br />seven of the study intersections currently operate at LOS "D" or better. Adding traffic from the <br />approved but not builbcompleted projects will result in one intersection not meeting the LOS <br />"D" or better standard: <br />• Valley Avenue at Santa Rita Road -LOS "E" in the PM peak hour <br />Adding the traffic from the proposed project to the approved projects will not result in any <br />additional intersections exceeding the LOS "D" or better standard. The project would add a <br />very small overall average delay of 1.6 seconds to the Valley Avenue/Santa Rita Road <br />intersection, resulting in no change to the LOS at this intersection in both the AM and PM peak <br />hours. The construction of a third southbound left-turn lane at this intersection will allow it to <br />operate at LOS D in the PM peak hour. The City is also exploring other mitigations for this <br />intersection. The mitigation at this intersection is considered to be a Citywide responsibility. <br />Therefore, the project's payment of the City and Tri-Valley Traffic Impact Fees is considered to <br />be its mitigation of this improvement. <br />Staff notes that the proposed project would generate considerably less traffic than the 1,000- <br />student high school that was previously assumed for this site. The high school would have <br />generated approximately 1,160 AM peak hour trips and approximately 100 PM peak hour trips <br />(as noted above, the proposed project would generate approximately 30 AM peak hour trips and <br />53 PM peak hour trips). <br />PUD-74 Page - 9 - June 25, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.