My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
09 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:44 PM
Creation date
2/12/2009 4:35:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and grading, building foundations, flatwork, retaining walls, and pavements. The project's <br />proximity to the Zone 7 lake was also analyzed for potential geologic hazards. <br />From a geotechnical engineering standpoint, Cornerstone Earth Group states that the proposed <br />development can be constructed as planned, provided that the recommendations contained in the <br />report are incorporated into the project design and grading. Examples of recommendations <br />include: remove the existing soil stockpiles and only reuse them for backfili if they meet certain <br />criteria; compact soils in accordance with the latest American Society for Testing and Materials <br />standards; and post-tensioned concrete mat foundations need to be based on procedures <br />developed by the Post-Tensioning Institute (latest edition) and as referenced in the 2007 <br />California Building Code. Cornerstone Earth Group also determined that the proposed <br />development was set back an adequate distance from the top of the Zone 7 lake's slope bank to <br />avoid any potential geologic hazards. A condition of approval has been included that requires <br />the applicant to comply with the recommendations listed in the geotechnical report. <br />The geotechnical study was reviewed and conditionally accepted by the City Engineer. The <br />City Engineer has requested that a condition of approval be included which requires the unstable <br />portions of the adjacent Zone 7 lake's slope bank be repaired prior to the construction of Lots 31 <br />through 42 unless pier and grade beam foundations are used for these homes. <br />Architecture and Desien <br />The project proposes four different plans: Residence One, Two, and Three are single-story <br />homes with three elevation styles each; and Residence Four is two-story home with three <br />elevation styles. The elevation styles include "Mediterranean," "Cottage," "Tuscan," and "Napa <br />Craftsman." Nine different color schemes generally comprised of earth tones and natural colors <br />are proposed for exterior paint, stone, brick, and roof colors. In order to ensure that the colors <br />compliment the architectural style of the proposed homes, some of the color schemes are limited <br />to a specific elevation style. <br />Staff generally feels that the building designs are attractive and that the architectural styles, <br />finish colors, and materials will complement the surrounding development. Staff is <br />recommending a few minor changes which it believes would enhance the overall design of the <br />project: 1) staff believes the building architecture should be "four-sided," with front elevation <br />trim/window elements carried through on all sides of the buildings; 2) staff recommends that <br />additional cornice detailing be added to the turret on the "Mediterranean" elevation and that the <br />turret roof pitch be slightly steepened, if feasible, on this elevation type; and 3) since the <br />"Tuscan" and "Mediterranean" elevations on Residences Three and Four have basically the <br />same first floor elevations, staff is recommending that the same elevation types not be placed <br />next to each other. Conditions of approval address these recommendations. In addition, since <br />actual samples of the roof, stone, and brick have not been provided, staff has included a <br />condition which requires that actual color/material samples of the roof, stone, and brick be <br />submitted for final review and approval by the Director of Planning and Community <br />PUD-74 Page -14 - June 25, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.