Laserfiche WebLink
installed along portions of the site perimeter to provide proper slope for utilities or to provide <br />adequately sized flat area in the rear yards. Staff finds the proposed grading to be minor and <br />generally acceptable. Staff is recommending a few relatively modest changes which it believes <br />would enhance the overall project. First, staff recommends that short (up to approximately 2.7- <br />foot tall) retaining walls be installed along the rear property lines of Lots 10-13 and 16-17 in <br />order to eliminate the 2:1 slope bank in the rear yards and to maximize the flat, usable space. <br />Second, Lots 32-40, 44-51, and 78 would have up to a 3.5-foot tall retaining wall along the rear <br />property lines. A seven-foot tall precast wall would be located on top of this retaining wall, <br />resulting in up to a 10.5-foot tall wall as viewed from the residences where there could be a 10- <br />foot rear yard setback to the home. Staff feels that a 10.5-foot tall wall would be overbearing on <br />these properties. Since the seven-foot wall height is not required for noise mitigation at this <br />location, staff is recommending that the soundwall either be lowered in height or be designed <br />with openings in the upper portions of the wall. Conditions of approval address these items. <br />Drainaee Plan <br />In order to reduce stormwater runoff and pollutants from the site, drainage from the roofs and lot <br />surface drainage would be conveyed to and treated by grassy swales between the homes and <br />sidewalk/street. Bioretention and landscape-treatment areas would be located in the common <br />open space areas. The project would also include an underground storage basin in order to <br />match pre-project runoff from the site. These are types of stormwater runoff measures that are <br />strongly supported by the Regional Water Quality Control Board and local agencies like <br />Pleasanton implementing the urban clean water runoff program. <br />Drainage from most of the private roads would be conveyed to media filtration vaults (i.e., <br />oil/water separators) below the roadway. Staff notes that media filtration units are no longer a <br />preferred stormwater treatment measure by the Regional Water Quality Control Board and local <br />agencies implementing the urban clean water runoff program as they require regular <br />maintenance and do not provide an effective means to treat both the quantity and quality of <br />stormwater runoff from a site. Therefore, staff recommends that the applicant utilize an <br />alternative storm water treatment for the roads and that its design be shown on the tentative map <br />plans. <br />Geotechnical Study <br />A Zone 71ake (formerly Hanson Aggregates quarry) is located to the north and northeast. The <br />top of the bank of the lake is approximately 85 feet from the northern perimeter of the project <br />site. The lake's southern slope bank is steeply sloped (roughly 1.5:1 to 2:1). Portions of the <br />slope bank are unstable and Zone 7 is working with the former owner to repair it. <br />A geotechnical investigation was prepared by Cornerstone Earth Group to evaluate the physical <br />and engineering properties of the subsurface soils and prepare recommendations for site work <br />PUD-74 Page -13 - June 25, 2008 <br />