My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
022409
>
04 ATTACHMENT 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2016 2:42:11 PM
Creation date
2/20/2009 11:55:28 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/24/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
04 ATTACHMENT 10
Document Relationships
10
(Cross Reference)
Path:
\CITY CLERK\AGENDA PACKETS\2009\020309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />improves safety of kids who are traveling to schools near valley /Santa Rita — there are 4 schools within about 1 mile of <br />Valley. By having another circulation route, this reduces traffic in these very congested areas. <br />We need to follow through on commitments we have made to our residents and other cities for many }rears. As <br />promised, we should be building SDE in concert with our related plans to build El Charro and Dublin Blvd over the next few <br />years. <br />Finally, extending Stoneride will not turn it into a freeway as some have claimed. In a worst case, the maximum <br />number of cars that can use SDE to bypass the freeway is about 1,000/hour at peak commute times) due to freeway on ramp <br />monitoring (1,000 is minimal compared to traffic levels our 4 lane arteries such as valley and Stoneridge were designed for. <br />Fast traffic study estimated 2,000/hour on Valley). This is minimal amount of cars for this roadway and will result in <br />reduced congestion in many others areas of the city that these cars now use. <br />In summary, please continue with plans to get St nerid.ge Drive built while others are willing to Pay and in <br />concert with other re ional plans for related. road. extensions such as 1 arro and. Dublin Blvd. We need. <br />improved. circulation to help ups get around. and Stnerid.ge has always been in the Plan to provide a <br />second east/west artery in addition to Valley. <br />Thank you. <br />Heidi Massie <br />4183 lull +fit <br />o9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.