Laserfiche WebLink
C.7: Provide bus stop pullouts on Stoneridge Drive /Auto Mall Place. <br />C.8: Require six foot wide sidewalks and six foot wide landscape strips along <br />Stoneridge Drive, Auto Mall Place, and El Charro Road, as shown in Figures I -V 1, IV -2, <br />IV -4, IV -6, and IV -7. Sidewalks may be wider within the Community Park and <br />Neighborhood Park. A separated sidewalk may be constructed along the western side of <br />El Charro by the auto mall's frontage, if in the future a sidewalk is constructed on the <br />western side of the El Charro Road I -580 freeway overpass. Caltrans may require a <br />monolithic sidewalk within its right of way. <br />C.9: Require public review if emergency access points are proposed to be eliminated. <br />C.10: Work with Zone 7 and local residents to create pedestrian and bicycle connections <br />to the north side of the Arroyo Mocho. <br />C.11: Work with Zone 7 to make the potential regional trail an asphalt multi use trail with <br />a running path. <br />C.12: Work with Zone 7 to consider a paved pedestrian and bicycle connection to a <br />potential multi use asphalt trail with running path on the south side of the Arroyo Mocho, <br />if deemed appropriate by the City Council. <br />C.13: Consider a future four lane extension, with tum lanes, of Stoneridge Drive to El <br />Charro Road consistent with the General Plan. <br />C.14: A future extension of Stoneridge Drive to El Charro Road would require the <br />entrance road into the Community Park to be relocated such that it aligns with the entrance <br />road into the Continuing Care Community and Neighborhood Park. <br />C.15: Provide an access route through the southwest comer of the site for maintenance <br />vehicles, pedestrians, and bicyclists to reach the Arroyo Mocho maintenance road. <br />Stoneridge Drive Specific Plan Amendment/Staples Ranch <br />Draft October, 2008 <br />47 <br />