My WebLink
|
Help
|
About
|
Sign Out
12 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
051909
>
12 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2009 12:43:53 PM
Creation date
5/14/2009 1:16:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/19/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
12 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.6.b Visitors standing outside a unit's door must be visible inside the unit, even for <br />children or the disabled. This requires double peep holes, doors with clear windows, <br />or side windows that allow inside residents at all heights to view and identify callers. <br />(1 Points) <br />Verification: Plan notes and a final inspection of residence entries from the Building <br />and Safety Division shall be required <br />A.8.b This point applies to non residential spaces only. Typically only applicable on <br />projects with more than 10% conditioned floor area dedicated to non residential <br />uses. <br />(28 Points) <br />Build to exceed the Title 24, Part 6 (2005) building code that mandates minimum <br />energy efficiency in buildings. A Title 24 report showing the percentage above code <br />in the form PERF -1 for non residential portions of the buildings shall be required. If <br />the project uses energy modeling (computer simulation) to show performance above <br />Title 24 minimums, then the final simulation report (approved by the Building and <br />Safety Division) must be used to show evidence of beating the Title 24. The report <br />must include actual building components and HVAC systems included in the final <br />building design (i.e. simulation is run off of plans at least at the 100% Construction <br />Documents phase). If more than one Title 24 report is available for the non- <br />residential portions of the project, enter the combined weighted average (based on <br />square footage) of percent above code for the various reports. <br />Verification: The Building and Safety Division will review Title 24 report(s) found on <br />the building plans showing percent above Title 24. Submittal of the <br />calculations for average percent above Title 24 (if applicable) shall also <br />be required. <br />Electronic copies of the CF-1R or PERF -1 forms may be required. <br />B.2.a This point applies to all floor, wall and roof framing, excluding roof trusses. 80% or <br />more of framing materials will be delivered to the job -site pre -cut or pre assembled <br />from supplier (determined by board -foot or as a percentage of total framing material <br />cost). This includes interior and exterior studs, headers, joists, beams, <br />posts /columns, and more (excluding roof trusses). Steel framing or other pre <br />assembled components can be included in this measure if the components do not <br />include insulation. <br />Note: Pre fabricated walls, floors or roofs that have insulation installed, such as SIPs <br />or other pre -made building systems are not eligible for this measure, but are eligible <br />for measure C.7. <br />Civic Square Apartments 6 of 14 Multifamily GreenPoint Comments <br />4800 Bernal Avenue PUD- 84- 21 -01M <br />
The URL can be used to link to this page
Your browser does not support the video tag.