My WebLink
|
Help
|
About
|
Sign Out
12 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
051909
>
12 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2009 12:43:53 PM
Creation date
5/14/2009 1:16:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/19/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
12 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.7.b Submittal of a landscape plan with species noted with supporting documentation <br />from the Landscape Architect/Designer stating that no invasive plants are included in <br />the landscape areas. <br />(1 Point) <br />A.7.c Provide a plant list cross referenced to the low -water planting guidelines. Include a <br />calculation that shows over 75% of plants meet the measure requirements. <br />(1 Pont) i <br />A.7.e Provide staff with an irrigation plan noting systems to be used. <br />(1 Point) <br />A.7.f Submit an irrigation plan showing detailed mapping of hydrozoning application. <br />(1 Point) <br />D.3.a /b Plan notes and inspection for adequate preparations on solar water heating systems <br />for future use. <br />*(5 Points) "a" and "b" combined <br />D.4.a Plan notes, inspection, and manufacturer literature or, in instead of literature, submit <br />an Accountability Form signed by the Architect or Mechanical Engineer stating that <br />are conditioner refrigerants do not contain CFCs or HCFCs. <br />(1 Point) <br />D.5.a Provide a copy of the HERS report showing air infiltration leakage of 0.35 ACH or <br />lower. <br />(2 Points) <br />D.7.a /b Inspection is feasible for linear fluorescent lamps that have either green end -caps <br />(Philips ALTO or green print on the lamps (GE Ecolux 0). Submit manufacture <br />data showing compliance with TCLP for all applicable lamp types. <br />*(3 Points) "a" and "b" combined <br />D.13.b Plan notes, product literature showing flow rate and MaP or UNAR testing report for <br />each model, and final inspection. <br />k(6 Points) if all of "b" is achieved <br />E.1.a Measure B.3 (Construction IAQ Plan) is a prerequisite for this measure. In addition, <br />the following is required: Plan notes, documentation signed by the Owner or <br />Contractor stating that a 2 -week flush -out has been performed to the criteria herein, <br />and submittal of the IAQ Management Plan. <br />(1 Point) <br />E.3.a Plan notes, floor plan and final inspection. <br />(2 Point) <br />Civic Square Apartments 13 of 14 Multifamily GreenPoint Comments <br />4800 Bernal Avenue PUD- 84- 21 -01M <br />
The URL can be used to link to this page
Your browser does not support the video tag.