My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Supplemental Material 06242026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
06-24
>
Planning Commission Meeting Supplemental Material 06242026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 12:40:35 PM
Creation date
7/8/2026 12:40:32 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMORANDUM <br />Date:June 24, 2026 <br />To: Planning Commissioners <br />From:Jenny Soo Associate Planner <br />Subject:Item No. 4 <br />The following are staff responses in italic to questions raised by individual Commissioners: <br />1.How much is this project paying for traffic fees? Is there a separate fee for El Charro Road? <br />The Pre-Annexation and Development Agreement (PADA) allows the use of the 2024 Fee schedule <br />for the Project, per the “Projects in Progress” provisions adopted as part of the Impact Fee Update. <br />Hence, the Transportation Development Fee is set at $11,642 per dwelling unit, and Tri-Valley <br />Transportation Fee is set at $6,946.01 per dwelling unit. The PADA separately requires this Project <br />to contribute $3 million towards the design and construction of a future El Charro Road extension. <br />Staff notes, Traffic Engineering’s preliminary estimates for the construction of El Charro Road came <br />in at approximately $120 million. Based on the size of the Arroyo Lago project, and its trips <br />generated, their pro-rata share toward El Charro Rd was estimated by Traffic Engineer to be just <br />over $8 million. The applicant only agreed to pay $3 million per the DA. <br />2.Will all houses have 2-car garages? <br />Yes. <br />3.How much street parking is available and where is it located? <br />Street parking would be provided on all public streets. Please see Sheet C2.1 of the Project plans for <br />details. <br />4.Do the JADU's have separate entrances? Do they all have kitchens and bathrooms? <br />Yes. Please see Floor Plan 3 and Floor Plan 6 of the Project plans for details. <br />SUPPLEMENTAL MATERIAL <br />Provided to the Planning Commission <br />After Distribution of Packet <br />Date Distributed: ________________6/24/2026
The URL can be used to link to this page
Your browser does not support the video tag.