My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
8/17/2026 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 5 <br />Item #18 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />November 19, 2024 <br />Public Works - Utilities Division <br /> <br />TITLE: ACCEPT THE FINAL WATER SYSTEM MANAGEMENT PLAN DATED OCTOBER <br />2024 <br /> <br />SUMMARY <br />The City has developed a Water System Management Plan (WSMP) that recommends a near- <br />, mid-, and long-term Capital Improvement Program (CIP) and improvements to the operation <br />and maintenance (O&M) program to determine funding needs that will ensure the sustainability <br />of the water system. As a foundational planning document, the WSMP will be reviewed on a 2- <br />year cycle to evaluate implementation progress and will be updated on a 6-year cycle to reflect <br />any changes in key factors and needs. These regular updates are necessary to accommodate <br />changes in system priorities and to update the City’s rates and connection fees that support <br />effective water system management. <br /> <br />The City Council approved a contract for Carollo Engineers (Carollo) in 2022 to prepare the <br />WSMP. The effort focused on conducting and reviewing several technical evaluations on water <br />supply and quality, water distribution system capacity, condition of facilities, system risk and <br />resilience, and O&M best practices to inform the City’s CIP and O&M program <br />recommendations. The resulting CIP includes prioritized projects to be implemented over a 20- <br />year timeframe. <br /> <br />The resulting long-term CIP includes prioritized projects to be implemented over the 20-year <br />span with a cost estimate of $262 million; however, as implementation will require additional <br />City engineering staff and result in new O&M requirements, the total estimated cost impact <br />ranges from $283 to $289 million. Additionally, O&M program improvements were <br />recommended for compliance with future regulations and to be consistent with industry best <br />practices; implementation and additional O&M staff over the 20-year span is $19 million. <br /> <br />The WSMP will be used as the foundation for the City's upcoming water rate connection fee <br />studies. The studies will utilize the results of the WSMP to calculate and recommend a water <br />rate structure for the City, including user rates and connection fees that support the City’s <br />water system capital and operational needs. Different alternatives and scenarios, including the <br />phasing of projects and the pros and cons of the delivery alternatives, will be evaluated during <br />the water rate and connection fee studies. As part of these studies, options for financing, near <br />versus long-term funding, risk to operations, and resource impacts to the City for each <br />alternative will be evaluated. <br /> <br />RECOMMENDATION <br />Approve the 2024 Water System Management Plan dated 2024. <br /> <br />BACKGROUND <br />The City owns and operates a potable water system under a permit from the State Water <br />Page 421 of 658
The URL can be used to link to this page
Your browser does not support the video tag.