Laserfiche WebLink
REIMBUR~MENT AGREEMENT FOR WATER MAINLINE <br />OAK MANOR--TRACT 5927 <br />THIS AGREEMENT is entered into this 1~~~ day of rlL 1996, by and <br />between the CITY OF PLEASANTON, a municipal corporation ("City") and Robert D. and <br />Shirley M. Branaugh ("Developer"). <br />A. Developer is the owner of certain real property in the County of Alameda, State of <br />California, commonly known as "Oak Manor--Tract 5927," Assessor's Parcel Number <br />946-3701-008 ("the Property"). <br />B. In connection with the development of the Property, Developer intends to construct <br />a main waterline from the City's existing water mainline in Foothill Road through a public <br />service easement within the Property and then reconnecting to the existing main waterline in <br />Footh i I I Road. <br />C. The City has agreed to provide water to the Property. To serve better City residents <br />along Foothill Road, City has requested the Developer to oversize the water mainline from an <br />eight-inch to a twelve-inch line. <br />D. The water mainline shall be installed within Alameda County road right-of-way and <br />within a public service easement permitting the City of Pleasanton to provide the right to <br />maintain, upgrade, and repair the water mainline. <br />E. Developer is willing to oversize the line if the City is willing to reimburse <br />Developer for the material costs to oversize the water mainline from an eight-inch to a <br />twelve-inch line. <br />NOW, THEREFORE, it is agreed as follows: <br />1. Improvements. Developer shall install a twelve inch loop water mainline from the <br />City's existing water mainline on Foothill Road through the Property and reconnecting to the <br />existing water mainline in Foothill Road. <br />2. Reimbursable Costs. Developer shall be reimbursed by City only for the material <br />costs to increase the water mainline from an eight-inch to a twelve-inch line. The Developer's <br />engineer has estimated the City's share to oversize the water mainline from an eight-inch to a <br />twelve-inch line as $7,320.00. Within 60 days after the completion of the water mainline, <br />Developer shall submit to the City Engineer actual material costs resulting from the oversizing of <br />the water mainline size from an eight-inch to a twelve-inch line. Thereafter, the City Engineer <br />shall review for appropriateness, using a standard of reasonableness. If the City Engineer <br />determines any reimbursable cost is not appropriate, the City's reimbursement shall be adjusted <br />downward. Reimbursement shall be based only on actual material costs, as approved by the <br />City Engineer. <br />-1- <br />