My WebLink
|
Help
|
About
|
Sign Out
RES 00059
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2005 4:54:39 PM
Creation date
6/1/2000 12:00:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2000
DOCUMENT NO
00059
NOTES
TRI-VALLEY
NOTES 3
TRANSPORTATION PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Tfl-Valley Transportation Plan/Adion Plan Update <br /> <br />Average Vehicle Ridership. This TSO relates directly to commute trips. The Bay Area Air Qual- <br />ity Management District has defined average vehicle ridership (A VR) and how it can be <br />calculated. To calculate A YR, annual employee surveys, conducted by employers, will be <br />necessary. In many places these are already being done. All rri-Valley jurisdictions have <br />trip reduction ordinances, so A VI{ should be increasing in the future. Employers can take <br />credit for shifting trips out of the peak hour, shorter work weeks, and telecommuting in <br />addition to promoting ridesharing and transit usage. A VR should be monitored by each <br />jurisdiction through its trip reduction ordinance. <br /> <br />Development Applicotions <br /> <br />Adoption of the Tri-Valley Transportation Plan will bring additions to the analysis required <br />of new development and does not relieve the jurisdiction of meeting CEQA and CMA re- <br />quirements. This will affect both environmental impact reports and general plan amend- <br />ments. Transportation studies for development applications in the Tri-Valley area shall as- <br />sume gateway constraints described in this plan. The Contra Costa Transportation Author- <br />ity has incorporated the use of gateway constraints in their Technical Procedures. <br /> <br />Environmentallmpad Reports. These should be circulated to all jurisdictions that make up the <br />TVTe, since most projects large enough to require an EIR will impact more than one juris- <br />diction. In addition to any other cumulative analysis, the cumulative analysis section of <br />each EIR should consider the Expected Land Use and transportation scenario on which the <br />TVTP is based. The CMAs are required to use ABAG projections. The Expected Land Use <br />scenario is greater than ABAG so it is more conservative and should be considered consis. <br />tent, Transportation impacts should be stated in terms of whether or not the project would <br />lead to a violation of Transportation Service Objectives. Transportation mitigation meas- <br />ures should be consistent with the TVTP network. <br /> <br />General Plan Amendments. The 2010 expected land use and transportation network, which are <br />incorporated into the TVTP, are based on information supplied by the TVTC member ju. <br />risdictions on their expected 2010 developments as of June 1994. Any general plan <br />amendments may affect either the adequacy of the planned network or the financing plan. <br />Any jurisdiction considering a general plan amendment should evaluate its impact on the <br />TVTP and demonstrate that the Transportation Service Objectives could still be met. If <br />further transportation improvements are necessary beyond what are in the lVrP, the ju. <br />risdiction should specify how they would be funded. <br /> <br />The Action Plans for Routes of Regional Significance will be based upon adopted General <br />Plan land uses, the existing road network, and planned improvements to the network. Con- <br />sistency with the Action Plans must be established for any changes to the General Plan that <br />may significantly reduce the ability of the facility to meet the Traffic Service Objectives. <br />The Regional Committee will be responsible for establishing the type and size of amend- <br /> <br />Page 70 <br /> <br />18 April 2000 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.