My WebLink
|
Help
|
About
|
Sign Out
RES 00059
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2005 4:54:39 PM
Creation date
6/1/2000 12:00:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2000
DOCUMENT NO
00059
NOTES
TRI-VALLEY
NOTES 3
TRANSPORTATION PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />9. Update Adion Plan <br /> <br />mem that will require review by the Regional Committee and the process for implementing <br />this review. Approval of a General Plan i\mendmcnt found to be inconsistent with the <br />adopted Action Plans may render the jurisdiction ineligible for Local Street Maintenance <br />Improvement Funds from the CCTA. <br /> <br />Consistency with the Action Plans can be achieved by revising the proposed amendment, <br />adopting local actions to offset impacts to the Route of Regional Significance, or Council <br />or Board denial of the amendment. <br /> <br />Growth Management Tools. The TVTP is not intended to be a land use control document. <br />While the plan is based on a set of growth assumptions, the plan should not be interpreted <br />as limiting growth to the assumed le\'els. Nevertheless, the plan does establish Transporta- <br />tion Service Objectives, which may indirectly influence growth rates. Growth beyond what <br />is assumed herein may occur provided the TSOs are met. <br /> <br />If there are TSO violations, or projected TSO violations, in a Tri.Valley jurisdiction, then <br />that jurisdiction can either (a) implement transportation improvements (e.g., road widen- <br />ing) to correct the TSO deficiency on that affected network segment, or (b) implement <br />other measures inrended to result in measurable improvements to TSOs on the Routes of <br />Regional Significance network and contribute to significant improvements in air quality. <br />Failing this, the jurisdiction can refer the problem to the TVTe for joint resolution. In the <br />event that the TVTC cannot resolve the violation to the mutual satisfaction of all members, <br />the jurisdiction may modify the TSO standard, but only if other jurisdictions are not physi- <br />cally impacted. <br /> <br />The tools and procedures for conducting General Plan updates in Contra Costa County <br />and analyzing proposed General Plan amendments will be the same as those used in pre- <br />paring the Growth Management Elements. If the specific project or policy changes are <br />large enough to meet requirements established by the region in its adopted Action Plan, the <br />jurisdiction considering the Plan amendment must submit the <1mendment to the Regional <br />Committee for evaluation of its impact on the ability to achieve Action Plan objectives. The <br />Growth Management Program directs the RTPCs to evaluate proposed amendments only <br />in relation to issues affecting Action Plan success and consistency. It will be the responsibil- <br />ity of the jurisdiction considering the amendment to either: <br /> <br />1. Demonstrate that the amendment will not violate Action Plan policies or the ability to <br />meet Action Plan Traffic Service Objectives; or <br /> <br />2. Propose modification to the Action Plan that will prevent the General Plan amendment <br />from adverseJy affecting the regional transportation network. <br /> <br />18 April 2000 <br /> <br />Page 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.