Laserfiche WebLink
Project <br />Description <br />Estimated Cost <br />Downtown Parking (3 Lots) <br />To accommodate future commercial growth and <br />public use in the downtown area, the City has <br />estimated that approximately three policing lots will <br />be required to meet future parking demands in this <br />area. The exact location and size of each parking lot <br />is dependent upon the availability of property and <br />market values and studies being undertaken <br />downtown. Parking needs and availability are being <br />reviewed by the Downtown Specific Plan Committee. <br />$900,000 is <br />funded in Cam. <br />Additional costs <br />unknown at this <br />time. <br />Miscellaneous: Additional Lighted <br />Sports Fields <br />A reserve has been established to fund a new <br />community park However the enact location, size <br />and cost of the park has not yet been determined. As <br />a result reserve revenues of $2,550,000 projected to <br />be accumulated by the end of this CIP may not meet <br />park costs. <br />Undetermined <br />Miscellaneous: Central Irrigation <br />System Phase Ill <br />This project will connect the five remaining parks to <br />the Central Irrigation system includes the purchase <br />and installation of satellite service controllers and <br />flow monitors on all park sites that have the new <br />controllers. <br />$100,000 <br />South Pleasanton Community Park <br />(5 acres) <br />This project involves design and construction of 5 <br />acres of community park space in the Happy Valley <br />area, at a yet to be determined site. Amenities could <br />include youth play equipment, casual picnic areas, <br />open field play space, pathways and landscaping. <br />The exact type and mix of uses for this site will be <br />determined through a Park Master Plan process, <br />which is managed by staff and the Parks and <br />Recreation Commission <br />$625,000 (PFF) <br />BMX Bike Site <br />There has been an interest in establishing a site that <br />can be used for riding BMX type bikes. At this lime <br />Undetermined <br />a site acquisition is underway. Costs for the project <br />are not yet available. <br />Vineyard Avenue Corridor <br />Community Park (20 acres) <br />Design and construction of a 20 acre community park <br />off Vmeyard Avenue on the fonner landfill site. <br />Possible amenities for the site could include casual <br />use sports fields; basketball and miscellaneous <br />courts; picnic areas; pedestrian trails; parking; rest <br />moms; and other related amenities. The exact type <br />and mix of uses for this site will be detennined <br />through a Park Master Plan process, which is <br />manned by staff and the Parks and Recreation <br />$2,500,000 (PFF) <br />LISTING OF HIGH PRIORITY UNFUNDED PROJECTS <br />FY 2000 -01/2003-04 <br />94 <br />REVISED cip unfunded Peje is a <br />5/18/2000 <br />