Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br />N. Visual Resources <br />Page 95 <br />Action by Monitor: (1) Verify [hat sound mitigation features abng [he west side of I-6S0 <br />are incorporated into the Specific Plan as specified. <br />(2) Verify that features are built as specified. <br />Monitoring Timing: (]) Prior [o adoption of the Specific Plan. <br />(2) Upon construction of soundbertns. <br />NOTE: IMPLEMENTATIONOFTHlS MEASURE CONSISTENT WITH THE AUGUST, 2000 <br />SPECIFIC PLAN WILL NOTMITIGATE THIS IMPACT TO A LESS-THAN- <br />SIGNIFICANTLEVEL INALL LOCATIONS. <br />Monitor: Completion Date: Signature: <br />