My WebLink
|
Help
|
About
|
Sign Out
2010 JANUARY
City of Pleasanton
>
CITY CLERK
>
MUNICIPAL CODE SUPPLEMENTS
>
2010 JANUARY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 4:04:04 PM
Creation date
7/27/2010 3:51:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
CODE SUPPLEMENTS
DOCUMENT DATE
1/1/2010
DOCUMENT NO
SUPPLEMENT NO. 3
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Unused 15 Unit Set - Aside. In the event that any of the 15 units set aside pursuant to subsection <br />(C)(1)(b) of this section are not used as of December 1st, these shall be added to the units remaining <br />available in the first -come, first - served suballocation. <br />2. Approval Process. <br />a. Prerequisites for Issuance of Building Permit. A project developer may obtain first -come, first - served <br />building permits when, following the normal course of processing an application, the application is <br />deemed eligible for issuance of a permit by the building division and the suballocation for first -come, <br />first -served projects has not been fully utilized. Building permits will be issued typically following a <br />project's first having received all necessary discretionary approvals (e.g., PUD plan, design review, <br />tentative map), a recorded final map (if required), and complete plans for constructing the residential <br />unit. Partial building permit plans (e.g., foundation plans) shall not be sufficient for issuance of a <br />building permit under this subsection. At the time of issuance of the building permit, subdivision im- <br />provements sufficient to allow the issuance of a foundation permit are required to have been com- <br />pleted and all fees paid. <br />b. Limitations on Annual Building Permits per Project. <br />A first -come, first -served project developer shall be subject to the following limitations on the <br />number of building permits it may secure: <br />(a) For a project seventy to ninety nine (70 -99) units in size —a maximum of 35 building <br />permits per year. <br />(b) For a project 40 to sixty nine (40 -69) units in size —a maximum of 25 building permits <br />per year. <br />(c) For a project of less than 40 units a maximum of 20 building permits per year. <br />The size of the "project" shall be established based on the number of units included in the <br />discretionary approval for the project, regardless of the number of preexisting lots it includes; <br />any subdivision after the effective date hereof shall not create separate parcels for purposes of <br />creating discrete "projects." <br />(2) Notwithstanding the limitations established above, use by a project developer of any units <br />remaining in the first -come, first - served suballocation on December 1st or added to the first - <br />come, first -served allocation pursuant to subsections (C)(1)(c) and (C)(1)(d) of this section <br />shall not be limited by the annual project limitations established in subsection (C)(2)(b)(1) of <br />this section. <br />c. Small Project Applicants. Projects eligible to use the 15 unit small project set -aside are eligible to use <br />the first -come, first - served suballocation as follows: <br />(1) <br />From January 1st through March 3I st, small project applicants shall use the regular first -come, <br />first- served suballocation. <br />(2) From April 1st through November 30th, small project applicants shall use, first, the regular <br />first -come, first- served suballocation, if available, and, then, if not available, shall use any <br />available small project set -aside units. <br />After December lst, small project applicants shall use the regular first -come, first- served <br />suballocation. <br />d. Proration of Project Permits, Generally. The first -come, first - served suballocation is intended to he <br />made available to developers in chronological order as building permits are ready to be issued. How- <br />ever, in certain instances when the demand for permits is known to exceed the number of permits <br />available, the city shall prorate the available permits. Should the proration yield units in excess of <br />those available due to rounding, the city shall reduce the total to equal the units available in any man- <br />ner it finds equitable. <br />(I) <br />(3) <br />469 <br />17.36.080 , <br />(Pleasanton Supp. No. 3, I -10) <br />
The URL can be used to link to this page
Your browser does not support the video tag.