My WebLink
|
Help
|
About
|
Sign Out
12 ATTACHMENT 6
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
031814
>
12 ATTACHMENT 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:28:43 PM
Creation date
3/12/2014 3:53:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2014
DESTRUCT DATE
15Y
DOCUMENT NO
12 ATTACHMENT 6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Soo said no. <br /> Commissioner Ritter inquired how many outreach sessions the applicant had with the <br /> community. <br /> Ms. Soo replied that there was one Open House meeting held on the previous <br /> Wednesday. <br /> Ms. Stern added that as part of the Housing Element Update process and the rezoning <br /> of the sites, staff held several meetings related to this project. <br /> Commissioner Ritter inquired if there is a trail from West Las Positas Boulevard to the <br /> Arroyo where a cut-through on this property is being proposed. <br /> Ms. Soo replied that there is an existing trail along the south side of the Arroyo and a <br /> little segment between Hopyard Road and the Chabot Canal on the north side of the <br /> Arroyo. <br /> Ms. Stern stated that there is a gravel area along that area that is used as a service <br /> road, and the applicant would need to work with Zone 7 to get permission to extend <br /> that. She added that the existing trail along the south side of the Arroyo runs all the way <br /> to Hopyard Road. <br /> With respect to the required setback for the carports, Commissioner O'Connor inquired <br /> what a 50-foot setback would do to this development. He noted that there are quite a <br /> few parking spaces along the west side and inquired if there is another place on the site <br /> to locate those parking spaces. <br /> Ms. Soo replied that the applicant would have to change the carport to uncovered <br /> surface parking spaces with no structure. <br /> Commissioner O'Connor inquired if all the parking spaces would be accommodated with <br /> the 50-foot setback if the spaces were uncovered. <br /> Ms. Soo said yes. She added that it is the covered parking structure that would <br /> encroach within the 50-foot setback. <br /> Commissioner O'Connor inquired if staff has had any preliminary discussions with the <br /> applicant about trying to take some of the lower units in the front on West Las Positas <br /> Boulevard and changing those to put lower structures on the back. He noted that there <br /> is a mix of unit heights up front and that Buildings A and B are not all four-story. <br /> Ms. Stern replied that was correct; Building A has some three stories. <br /> EXCERPT: PLANNING COMMISSION MINUTES, September 11, 2013 Page 2 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.