Laserfiche WebLink
Jenny Soo <br /> May 8,2015 <br /> Page 9 <br /> Also,similar to the 2014 project,the 2015 project could expose residents to stationary noise sources that <br /> may exceed acceptable residential standards. The Noise Assessment prepared for the 2014 project by <br /> Charles M.Salter Associates,Inc.did not specifically quantify potential noise impacts from the adjacent land <br /> uses;however,surrounding uses include residential to the south,a school to the north,and commercial <br /> offices to the east and west,all of which are typically compatible with residential uses. Noise levels at the <br /> site in 2014 ranged from 54 dB DNL to 65 dB DNL,(inclusive of stationary noise sources)which are within <br /> the normally acceptable range for multi-family residential uses as indicated by the Pleasanton General Plan. <br /> Current onsite noise levels are not expected to have perceptively changed since 2014. Furthermore,Charles <br /> M.Salter Associates confirmed in an April 28,2015 email that the analyses and recommendations from the <br /> previously prepared Noise Assessment remain appropriate and applicable to the 2015 project. Nonetheless, <br /> the 2015 project would be required to implement Mitigation Measure 4.j-6c,which includes the issuance of <br /> noise disclosures and noise complaint procedures to all future residents. In summary,with the <br /> implementation of Mitigation Measure 4.J-1 and 4.j-6c,noise impacts related to the 2015 project would <br /> continue to be less than significant. <br /> Traffic <br /> Mitigation Measure 4.N-7:The City shall require developers on the potential sites for rezoning to contribute <br /> fair-share funds through the payment of the City of Pleasanton and Tri-Valley Regional <br /> traffic impact fees to help fund future improvements to local and regional roadways. <br /> Similar to the 2014 project,the 2015 project would result in additional trip generation,albeit to a lesser <br /> degree than the 2014 project due to the reduced unit count. The Traffic Impact Analysis prepared for <br /> the 2014 project concluded that all study intersections would continue to operate at acceptable LOS <br /> during the AM and PM peak hours under all analysis scenarios. This conclusion was based on the <br /> incorporation of the project's intersection improvements to West Las Positas Boulevard at Hacienda <br /> Drive, and the cumulative scenario planned traffic impact fee(TIF)improvements at the intersections of <br /> West Las Positas Boulevard at Hopyard Road,and West Las Positas Boulevard at Stoneridge Drive. <br /> Because the 2015 project would result in reduced trip generation as compared to the 2014 project, it is <br /> reasonable to conclude that the 2015 project would also not result in unacceptable LOS at any study <br /> intersections. In addition,the 2015 project would implement improvements to the West Las Positas <br /> Boulevard at Hacienda Drive similar to those of the 2014 project. <br /> Consistent with the Supplemental EIR,the 2014 Addendum required the implementation of Mitigation <br /> Measure 4.N-7, requiring developers to contribute fair-share funds through the payment of City if <br /> Pleasanton and Tri-Valley Regional TIFs to help fund future improvements to local and regional roadways. <br /> As such,with the implementation of Mitigation Measure 4.N-7,traffic impacts related to the 2015 <br /> project would continue to be less than significant. <br /> Utilities and Service Systems <br /> Mitigation Measure 4.L-2:Prior to the recordation of a Final Map,the issuance of a grading permit,the <br /> issuance of a building permit,or utility extension approval to the site,whichever is sooner, <br /> the Applicant shall submit written verification from Zone 7 Water Agency or the City of <br />