My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:53:30 AM
Creation date
6/11/2015 12:21:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jenny Soo <br /> May 8,2015 <br /> Page 10 <br /> Pleasanton's Utility Planning Division that water is available for the project. To receive the <br /> verification,the Applicant may need to offset the project's water demand. This approval <br /> does not guarantee the availability of sufficient water capacity to serve the project. <br /> Similar to the 2014 project,the 2015 project would result in additional water demands, albeit to a lesser <br /> degree than the 2014 project due to reduced unit count and onsite population. However,with the <br /> implementation of Mitigation Measure 4.L-2,the applicant would be required to submit written <br /> verification indicating that sufficient water is available to serve the 2015 project. As such, impacts <br /> related to the 2015 project's water demands would continue to be less than significant. <br /> Summary <br /> In summary,the 2015 project would be required to implement all applicable Supplemental EIR <br /> mitigation measures identified in the 2014 Addendum. Implementation of these mitigation measures <br /> would ensure that, similar to the 2014 project,the 2015 project would not result in any impacts beyond <br /> those considered in the Supplement EIR,and all impacts would continue to be less than significant. <br /> Substantial Conformity <br /> Due to the reduced unit count, and similar level of site disturbance associated with the 2014 project, it is <br /> concluded that potential environmental impacts from the 2015 project would be substantially similar to <br /> or reduced as compared to those disclosed in the 2014 Addendum. As such,with the implementation of <br /> mitigation identified in the 2014 Addendum and discussed herein,the 2015 project would not result in <br /> any impacts beyond those considered in the Supplemental EIR. All impacts would continue to be less <br /> than significant, or less than significant with the implementation of mitigation. The 2014 Addendum, in <br /> combination with this substantial conformity letter,satisfies the requirements of CEQA for the 2015 <br /> project and no further environmental analysis is warranted. <br /> FCS appreciates the opportunity to continue to support the City of Pleasanton and the Summer Hill <br /> Homes applicant. Questions regarding the content of this letter may be directed to Janna Waligorski at <br /> jwaligorski @fcs-intl.com or 530-519-9736. <br /> Sincerely, <br /> Janna Waligorski <br /> FirstCarbon Solutions <br /> 1350 Treat Boulevard,Suite 380 <br /> Walnut Creek,CA 94597 <br /> pi nt Ivn,ia)A nubV?i•nuxn0ACnntonnuts/I vitro A'I.lSDllw5uhaantoi Comfmioiiv A!ialvcr,,euci d.Iry <br /> iA <br />
The URL can be used to link to this page
Your browser does not support the video tag.