Laserfiche WebLink
(1) Substantial changes are proposed in the project which will require major revisions of <br /> the previous EIR or negative declaration due to the involvement of new significant <br /> environmental effects or a substantial increase in the severity of previously identified <br /> significant effects; <br /> (2) Substantial changes occur with respect to the circumstances under which the project <br /> is undertaken which will require major revisions of the previous EIR or negative <br /> declaration due to the involvement of new significant environmental effects or a <br /> substantial increase in the severity of previously identified significant effects; or <br /> (3) New information of substantial importance, which was not known and could not have <br /> been known with the exercise of reasonable diligence at the time the previous EIR was <br /> certified as complete or the negative declaration was adopted, shows any of the <br /> following: <br /> (A) The project will have one or more significant effects not discussed in the <br /> previous EIR or negative declaration; <br /> (B) Significant effects previously examined will be substantially more severe than <br /> shown in the previous EIR; <br /> (C) Mitigation measures or alternatives previously found not to be feasible would <br /> in fact be feasible and would substantially reduce one or more significant effects <br /> of the project, but the project proponents decline to adopt the mitigation measure <br /> or alternative; or <br /> (D) Mitigation measures or alternatives which are considerably different from <br /> those analyzed in the previous EIR would substantially reduce one or more <br /> significant effects on the environment, but the project proponents decline to <br /> adopt the mitigation measure or alternative. <br /> The California Environmental Quality Act states that a lead agency shall prepare an addendum <br /> to a previously certified EIR if some changes or additions are necessary, but none of the <br /> above-listed conditions in Section 15162 calling for the preparation of a subsequent EIR have <br /> occurred. Staff believed that none of the conditions described in Section 15162 occurred. <br /> Therefore, an addendum to the SEIR was prepared for this project. <br /> The analysis in the attached Addendum to the SEIR (Exhibit D) determined that the proposed <br /> project will not trigger any new or more severe significant environmental impacts as compared <br /> to those analyzed in the context of the SEIR and confirmed that none of the conditions <br /> described in Section 15162 occurred. <br /> The SEIR included some mitigation measures that needed to be addressed prior to issuance <br /> of a building permit for a project (e.g., pre-construction bat survey, air quality construction <br /> plan). These mitigation measures have been addressed in the draft conditions of approval for <br /> this project. <br /> Summerhill Housing Group Planning Commission <br /> Page 25 of 28 <br />