My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
071916
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:28:00 PM
Creation date
7/13/2016 8:50:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Proem Description and Approach <br />1-6 <br />and will also address cumulative effects relative to other reasonably <br />anticipated development, as well as project consistency with the regional air <br />quality plan. The analysis will discuss the regional and local air quality <br />setting, ambient air monitoring data, and current air quality management <br />efforts. The analysis will identify the nearest sensitive air pollutant receptors <br />to the rezone area — residences across Stoneridge Drive, to the south, and <br />across 1 -680, to the west —and any major existing sources of air pollutants, <br />including those in the inventory data compiled by the Bay Area Air Quality <br />Management District (BAAQMD). The BAAQMD CEQA Air Quality <br />Guidelines significance criteria with regard to air quality impacts will be <br />relied upon' <br />The EIR analysis will discuss emissions likely to be generated during <br />construction of subsequent development projects under the zoning <br />amendment, evaluate the potential for construction dust to cause any local <br />exceedances of ambient particulate standards, and estimate future criteria air <br />pollutant emissions from vehicular traffic and onsite stationary sources. The <br />SEIR analysis will identify, as feasible, what types and size of development <br />would likely be of concern. Further, ESA will address diesel particulate <br />matter (DPM), a toxic air contaminant (TAC), emitted from high - volume <br />roadways and stationary sources, as well as construction equipment, that can <br />cause health risk impacts. Mitigation measures from the General Plan EIR <br />and/or GPA EIR will be revised for their potential to reduce impacts at the <br />project site. Additional mitigation measures for aesthetic, visual and scenic <br />resources will be identified where necessary to reduce any significant effects. <br />• Noise. Project - related noise impacts could arise from the relatively high, <br />but temporary, noise levels from project construction activities and from the <br />long -term increases in traffic volumes. ESA will identify the noise - sensitive <br />land uses or activities in the vicinity of the project site, such as residences <br />across Stoneridge Drive. to the south, and roads that would receive motor <br />vehicle traffic generated by project development and assess the difference in <br />noise levels resulting from the change in traffic due to the proposed land use <br />change. Specific tasks will include documenting existing noise levels at the <br />project site by collecting long -term and short-term noise measurements at the <br />project site and calculate Ldn or CNEL average noise levels for the site, <br />based on the noise measurements for comparison to Land Use Compatibility <br />standards. Using the Federal Highway Administration (FHWA) noise model. <br />the analysis will quantify the increase in noise levels along roadways used to <br />access the project site based on traffic increases predicted in the <br />transportation analysis. ESA will rely on mitigation measures identified in <br />the General Plan EIR and/or GPA EIR, if necessary. <br />• Transportation and Circulation. ESA will team with Fehr and Peers <br />(F &P) to prepare a transportation and circulation analysis for the EIR. ESA <br />and F &P successfully provided the transportation analysis for the General <br />Plan Amendment and Re zoning EIR. F &P's proposed scope of work is <br />Although the BAAQMD significance cntena remain suspended pending a decision by the Calefomta <br />Supreme Court in a lawsuit filed by the California Balding Industry Association, these criteria arc <br />supported by substantial evidence in the form of BAAQMD's 20(19 Thresholds and Janificatinm <br />Report. <br />Cllr at Pleasanton Johnson Dove Econonvc Development Zone EIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.