Laserfiche WebLink
(ultimately, providing a full size standby along with the two initial duty pumps,three identical pumps, <br /> total). For the 3+1 alternative,a full size spare shall be provided (four pumps total). Either configuration <br /> is considered acceptable,and the Equipment Supplier may submit either one or both for consideration <br /> in their quotation. <br /> The local station controls shall be self-contained,with a local PLC to operate the station and register <br /> alarms. The Owner will provide and install a co-located TESCO panel mounted on the skid provided by <br /> the Equipment Supplier to communicate status to the Owner's control facilities. The Equipment <br /> Supplier furnished and installed PLC shall be capable of communicating status and alarms to the Owner's <br /> TESCO panel and receiving control signals from the District's TESCO panel,as detailed below to provide <br /> for full remote operation and control of the station.The TESCO panel shall be mounted by the Owner's <br /> contractor, however the equipment manufacturer's skid shall accommodate the space,weight and <br /> mounting requirements of the panel,as provided below,to allow direct mounting to the skid,complete <br /> with conduit and conductor runs to the panel. <br /> The station will be contained in a walk-in enclosure of fiberglass construction. While the City prefers <br /> that the equipment supplier provide the fiberglass enclosure,the City will entertain bids from suppliers <br /> that exclude the structure. As such,the basis for review of bids shall be the cost of the entire scope of <br /> supply presented below,excluding the enclosure. <br /> All equipment described below, including pumps, motors,control panels, instruments and electrical <br /> equipment, is to be skid mounted on a single, manufacturer-designed and constructed structural skid <br /> suitable for anchoring on a concrete slab on grade and housekeeping pad. <br /> The following requirements define the basic package requirements.Where noted "SPECIFY IN QUOTE," <br /> the equipment or proposed approach to meeting these requirements shall be specified in the <br /> Equipment Supplier's Quotation. <br /> PUMPS AND PUMP PERFORMANCE <br /> • Pumped Fluid: California Code of Regulations,Title 22 Disinfected Tertiary Treated <br /> Water for unrestricted use <br /> • Pump Configuration: <br /> o The station will house pumps in one of two configurations: <br /> • 2+1: two large pumps and one smaller,jockey pump. In this configuration,the <br /> City anticipates that the jockey pump will be used to convey lower flows <br /> associated with the initial system, but that the jockey will be replaced with a <br /> large pump as flows increase.Thus,the skid shall be configured to allow the <br /> jockey pump to be replaced in the future with a pump matching the size and <br /> physical dimensions of the large pump and all electrical equipment,conductors, <br /> related accessories and ancillary equipment shall be sized to support the future, <br /> large pump.Supply of the future large pump and the future VFD is not in the <br /> scope of this procurement. <br /> • 3+1: four identically sized pumps, of which 3 are duty and one is a ready <br /> standby. <br /> City of Pleasanton <br /> RW Booster Station Request for Quotation 2 <br />