Laserfiche WebLink
Item 3A—Summary of November and December 2018 Public Outreach <br /> • Noted increased connectivity to ACE is important. <br /> • Peters Avenue <br /> o Requested consideration of incorporating bus stops thoughtfully in to the <br /> design of the cycle track. <br /> o Noted the cycle track appears to begin and end out of nowhere, <br /> particularly on the north end- should it extend to Main? Should it extend <br /> down Case Avenue to the middle school? Should it connect to the Town <br /> Square trail- connecting it to Old Bernal and the transportation corridor? <br /> o Concerned the DSP proposed circulation will create more gaps in the <br /> transportation network which is contrary to the goal of the Bike/Ped Master <br /> Plan and closing gaps in the network. <br /> • Division Street <br /> o Suggested partial closure of Division in the near-term. <br /> o Commented the annotation (blue arrows on the image) for the changes is <br /> not clear. <br /> Joint Parks and Recreation Commission and Library Commission (December 6, 2018) <br /> General <br /> • Clarified the uses permitted in the Mixed Use Transitional Area. <br /> • Clarified that no substantial changes were made to the Historic preservation <br /> section. <br /> • Cautioned that extensive outreach should be done throughout this process to any <br /> properties that will have changes. <br /> • Recommended supporting night life to bring revitalization to the downtown. <br /> • Cautioned it will be challenging to keep up with expansion while maintaining <br /> historic "hallmark" feel of downtown. <br /> • Supported the parklet while it existed. <br /> • Suggested additional lights to be added to streets for safety at night. <br /> Transportation/Circulation Enhancements <br /> • Requested clarification on the look and feel of bicycle/pedestrian enhancements <br /> in corridor along First Street. <br /> • Supported Division Street transforming to a "walking street" with outdoor lighting <br /> and dining. <br /> • Suggested intersections on First Street be enhanced as the crossings are <br /> currently very dangerous. <br /> • Requested Main Street be made accessible to all- some materials we use (e.g., <br /> pavers) may not be ADA compliant/safe. <br /> Potential New Civic Center/Town Square <br /> • Inquired about the contingency plan if the vote for the new Civic Center fails. <br /> • Requested consideration be given to consider operational characteristics of the <br /> proposed parking structure during events like the County Fair. <br /> Prepared for the February 26, 2018 Downtown Specific Plan Update Task Force Meeting Page 4 of 8 <br />