My WebLink
|
Help
|
About
|
Sign Out
PC-2019-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 12:59:57 PM
Creation date
9/26/2019 11:37:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/26/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-16
NOTES
DSP_CERTIFY FEIR FOR DSP UPDATE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program for the City of Pleasanton Downtown Specific Plan <br />11 <br /> <br />Impact Mitigation Measure Method of Verification Timing of <br />Verification <br />Responsibility for <br />Verification <br />Verification Complete <br />Date Initial <br />eastbound left-turn <br />queue by more than 25 <br />feet during the both <br />peak hours. <br />The addition of <br />Proposed Plan traffic <br />would result in vehicle <br />queues at the <br />intersection of First <br />Street at Ray <br />Street/Vineyard Avenue <br />to extend beyond the <br />available storage in the <br />AM peak hour in the <br />existing With Project <br />condition. <br />TRA-4: Retime traffic signal. Monitor conditions <br />through applicant <br />traffic studies as <br />development <br />projects are <br />proposed. City shall <br />require payments of <br />Transportation <br />Impact Fees as <br />applicable. <br />Ongoing City of <br />Pleasanton <br />Community <br />Development <br />Department, <br />Traffic <br />Engineering <br />Division <br /> <br />The addition of the <br />Proposed Plan traffic <br />would result in vehicle <br />queues at the <br />intersection of First <br />Street at Neal Street to <br />extend beyond the <br />available storage in the <br />PM peak hour. <br />TRA-5: Retime traffic signal and <br />extend the eastbound left-turn by 30 <br />feet. <br />Monitor conditions <br />through applicant <br />traffic studies as <br />development <br />projects are <br />proposed. City shall <br />require payments of <br />Transportation <br />Impact Fees as <br />applicable. <br />Ongoing City of <br />Pleasanton <br />Community <br />Development <br />Department, <br />Traffic <br />Engineering <br />Division <br /> <br />The addition of the <br />Proposed Plan traffic <br />would result in vehicle <br />queues at the <br />intersection of Case <br />Avenue/Old Bernal <br />Avenue at Bernal <br />TRA-6: Extend the length of the <br />eastbound left-turn pocket to provide <br />275 feet of vehicle storage. <br />Monitor conditions <br />through applicant <br />traffic studies as <br />development <br />projects are <br />proposed. City shall <br />require payments of <br />Ongoing City of <br />Pleasanton <br />Community <br />Development <br />Department, <br />Traffic <br />
The URL can be used to link to this page
Your browser does not support the video tag.