Page 3 PUD-105 and P14-0852 <br /> July 9, 2019 <br /> JDEDZ <br /> The technical memorandum also discusses health effects of criteria pollutants along with the JDEDZ's potential <br /> cumulative health-related impacts consistent with the California Supreme Court's ruling in Sierra Club v. <br /> County of Fresno(2018)6 Ca1.5th 502. <br /> Consistent with the HRA,this analysis uses the updated and conservative assumptions about the timing of <br /> construction and the scope of project-related activity within the JDEDZ project area. For near-term activities, <br /> such as the first phase of construction, realistic assumptions are made based on the anticipated construction <br /> activity and phasing of development. For longer-term activities that may occur beyond the first phase of <br /> development, such as the development of commercial and retail space during phase 2,more conservative <br /> assumptions were made in order to provide a worst-case analysis of potential JDEDZ impact, because the actual <br /> construction activity and phasing of this development is currently unknown. These assumptions are provided in <br /> greater detail in Chapter 1 of the technical memorandum. <br /> For construction,this analysis shows the Project's criteria pollutant emissions are below the corresponding <br /> BAAQMD significance thresholds except for NOx emissions from Phase 1 construction. Phase 1 construction <br /> NOx emissions are estimated to be an average of 55.74 pounds per day(lbs./day), exceeding the significance <br /> threshold of 54 lbs./day. Therefore, mitigation is required to reduce JDEDZ impacts during Phase 1 <br /> construction. As such,all off-road equipment greater than 50 horsepower would be required to have engines that <br /> meet United States Environmental Protection Agency(USEPA)Tier 3 off-road emission standards. <br /> Implementation of this mitigation measure would reduce this impact to a less-than-significant level. <br /> For operations, Phase 1 operational activities are estimated to be an average of 54.60 pounds of ROG per day <br /> (lbs./day), exceeding the significance threshold of 54 lbs./day.Therefore, mitigation is required to reduce <br /> JDEDZ impacts during Phase 1 operations. As such,the JDEDZ would require all future tenants and building <br /> owners to use low-volatile organic compound(VOC)paints during maintenance activities.The VOC content of <br /> paints shall not exceed 10 grams of VOCs per liter.Implementation of this mitigation measure would reduce <br /> this impact to a less-than-significant level. <br /> Because of certain updated JDEDZ project details used in this analysis as compared to those used in the Draft <br /> SEIR(e.g. changes in square footage of some proposed land uses, construction phasing and equipment fleets), <br /> the conclusions with regard to the JDEDZ's criteria pollutants emissions have changed with this updated <br /> analysis. For example, conclusions about construction emissions changed from less than significant for all <br /> criteria pollutants in the Draft SEIR to less than significant with mitigation in this updated analysis(due to <br /> average daily unmitigated emissions during Phase 1 construction exceeding the BAAQMD threshold);the <br /> conclusions about project operational emissions have changed from significant and unavoidable impacts <br /> (attributable to average daily and total annual NOx and PM10 emissions)during full buildout operations in <br /> the Draft SEIR to less than significant for all operational scenarios including the full buildout operations. <br /> Greenhouse Gas Analysis <br /> Following the original approval of the project and certification of the JDEDZ SEIR,the California Office of <br /> Planning and Research adopted amendments to the CEQA Guidelines, including changes to CEQA Guidelines <br /> section 15064.4 addressing analysis of GHG emissions. Further, Senate Bill 32(2016)set a statewide GHG <br /> emissions reduction target of 40 percent below 1990 levels by 2030. The amendments became effective on <br /> December 28, 2018. The City's adopted Climate Action Plan(CAP)is only considered qualified through 2020 <br /> for purposes of GHG analysis under CEQA, but project buildout is expected to occur beyond 2020. In <br /> COMMUNITY DEVELOPMENT— P. O. BOX 520, Pleasanton, CA 94566-0802 <br /> Planning Building&Safety Engineering Traffic Inspection <br /> 200 Old Bernal Ave. 200 Old Bernal Ave. 200 Old Bernal Ave. 200 Old Bernal Ave. 157 Main St. <br /> (925)931-5600 (925)931-5300 (925)931-5650 (925)931-5650 (925)931-5680 <br /> Fax: 931-5483 Fax: 931-5478 Fax: 931-5479 Fax: 931-5479 Fax: 931-5484 <br />