My WebLink
|
Help
|
About
|
Sign Out
RES 201131
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2020
>
RES 201131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:46:16 AM
Creation date
2/7/2020 11:45:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
PERMANENT
NOTES
JDEDZ RFSEIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 (Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 4.B.Air Quality(cont.) <br /> 4. All vehicle speeds on unpaved roads shall be limited to 15 miles <br /> per hour. <br /> 5. All streets,driveways,and sidewalks to be paved shall be <br /> completed as soon as possible.Building pads shall be laid as soon <br /> as possible after grading unless seeding or soil binders are used. <br /> 6. Idling times shall be minimized either by shutting equipment off <br /> when not in use or reducing the maximum idling time to 5 minutes <br /> (as required by the California airborne toxics control measure <br /> Title 13,Section 2485 of CCR).Clear signage shall be provided for <br /> construction workers at all access points. <br /> 7. All construction equipment shall be maintained and properly tuned <br /> in accordance with manufacturer's specifications.All equipment <br /> shall be checked by a certified mechanic and determined to be <br /> running in proper condition prior to operation. <br /> A publicly visible sign shall be posted with the telephone number and <br /> person to contact at the City of Pleasanton Planning Division <br /> regarding dust complaints.This person shall respond and take <br /> corrective action within 48 hours.BAAQMD's phone number shall <br /> also be visible to ensure compliance with applicable regulations. <br /> All-sites Site-developer Prier-to the -Verified-by': <br /> -_ •_ _ _ ••_ :- • • ••t :_ _°• '' _ _--- _ - •- - located-within Community construction plans, issuanse-ef Da <br /> - - - -, - -• -•- ._ _ . , _ . = 1,980-feet-ef Development mer <br /> - sensitive Department building permits <br /> _ - - receptors measures preiest-construstion-plans, whichever-is-first <br /> Field-inspections <br /> - - - church daring <br /> construction, <br /> - - -- •_ • _... ._ _•- • - •-- housing, <br /> recreational, <br /> of-other <br /> -' - -• - • -• _• .. -= , e _ • - •- -• --- - --° sensitive--uses <br /> Johnson Drive Economic Development Zone 5-4 ESA/140421 <br /> Partial Recirculated DSEIR Response to Comments January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.