My WebLink
|
Help
|
About
|
Sign Out
RES 201131
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2020
>
RES 201131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:46:16 AM
Creation date
2/7/2020 11:45:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
PERMANENT
NOTES
JDEDZ RFSEIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 (Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring . Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> I i <br /> 4.B.Air Quality(cont.) <br /> Mitigation Measure 4.B-4: If a new sensitive residential use,such as All sites that Site developer shall hire Community Approve air quality consultant Approve Verified by: <br /> senior housing or a child-care or healthcare facility,is proposed within include a a qualified air quality Development selection. Review verification consultant Date: <br /> the EDZ area and within 300 feet of a fuel station or within 1,000 feet sensitive use consult to prepare an Department from air quality consultant. selection,and <br /> of warehouse loading docks or Highway 1-680,the developer of this such as,but HRA. review verification <br /> use shall prepare a health risk assessment report to be reviewed and not limited to, from air <br /> approved by the City.The health risk assessment shall demonstrate a senior consultant, prior <br /> that the increased cancer risks for the proposed sensitive use would housing to approval of <br /> be below the BAAQMD permitting limit of 10 in one million(per its facility,child- individual <br /> Policy and Procedure Manual,the BAAQMD would deny an Authority care or development <br /> to Construct or a Permit to Operate for any new or modified source of healthcare permit. <br /> TACs that exceeds a cancer risk of 10 in one million or a chronic or facility,within Verify inclusion of <br /> acute hazard index of 1.0); or,should the health risk assessment 300 to 1,000 approved <br /> determine that lifetime cancer risk would exceed 10 in one million,the feet of a measures. <br /> developer shall install in the sensitive use an enhanced ventilation source of <br /> filtration system such that the resultant lifetime increased cancer risk TACs. <br /> is less than 10 in one million. No sensitive use shall be approved <br /> within the EDZ where the health risk assessment determines that <br /> lifetime cancer risk from the freeway and from uses in the EDZ would <br /> exceed 10 in one million. <br /> 4.C.Noise <br /> Mitigation Measure 4.0-la:To address nuisance impacts of All Site developer shall Site developer Engineering Department: Prior to issuance Verified by: <br /> construction activities within the EDZ area,all developers of sites incorporate the Community Review and approve project of building or Date: <br /> within the EDZ area shall ensure that construction contractors specifications of this Development specifications and grading and grading permit, <br /> implement the following: measure into project Department construction plans for inclusion whichever is first. <br /> • Signs shall be posted at all construction site entrances to the specifications as well as of this measure into Field inspections <br /> ro ertupon commencement of construction,for the purposes grading and Engineering specifications. p <br /> p p y p y p constructionplans. Department during <br /> of informing all contractors/subcontractors,their employees, Community Development construction. <br /> agents,material haulers,and all other persons at the applicable Department:Inspect site during <br /> construction sites,of the basic requirements of Mitigation construction to ensure <br /> Measures 4.0-la and 4.0-lb. compliance with project <br /> • Signs shall be posted at the construction sites that include construction plans. <br /> permitted construction days and hours, a day and evening <br /> contact number for the job site,and a contact number in the event <br /> of problems. <br /> • An onsite complaint and enforcement manager shall respond to <br /> and track complaints and questions related to noise. <br /> Johnson Drive Economic Development Zone 5-5 ESA/140421 <br /> Partial Recirculated DSEIR Response to Comments January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.