Laserfiche WebLink
5.Mitigation Monitoring and Reporting Program(Revised January 2020) <br /> TABLE 5-1 (Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 4.C.Noise(cont.) <br /> Measure 4.C-lb:To reduce daytime noise impacts due to All Site developer shall Site developer Engineering Department: Prior to issuance Verified by: <br /> construction within the EDZ area,all project developers shall require incorporate the Community Review and approve project of building or Date: <br /> construction contractors working within 55 feet of the construction site specifications of this Development specifications and grading and grading permit, <br /> property boundary to implement the following measures: measure into project Department construction plans for inclusion whichever is first. <br /> • Equipment and trucks used for construction shall use the best specifications as well as En ineerin of this measure into Field inspections <br /> available noise control techniques(e.g., improved mufflers, grading and Department specifications. during <br /> equipment redesign, use of intake silencers,ducts,engine construction plans. Community Development construction. <br /> enclosures,and acoustically-attenuating shields or shrouds). Department:Inspect site during <br /> • Impact tools(e.g.,jack hammers,pavement breakers,and rock construction to ensure <br /> drills)used for construction shall be hydraulically or electrically compliance with project <br /> powered where feasible to avoid noise associated with construction plans. <br /> compressed air exhaust from pneumatically powered tools. <br /> Where use of pneumatic tools is unavoidable, an exhaust muffler <br /> on the compressed air exhaust shall be used;this muffler can . <br /> lower noise levels from the exhaust by up to about 10 dBA. <br /> External jackets on the tools themselves shall be used where <br /> feasible;this could achieve a reduction of 5 dBA.Quieter <br /> procedures,such as use of drills rather than impact tools,shall be <br /> used unless deemed not feasible by a geotechnical investigation. <br /> Mitigation Measure 4.0-1 c: Prior to the approval of the development All Site developer shall Community Review and approve acoustical ! Prior to the Verified by: <br /> of senior housing projects within the EDZ area,the City shall require prepare an acoustical Development assessment and interior approval of the Date: <br /> site-specific acoustical assessments to determine exposure to assessment that adheres Department measures.Verify approved development of <br /> existing and approved noise sources, impact,and mitigation to all specifications of this measures on construction senior housing <br /> regarding non-transportation sources. Noise exposure shall be measure. plans. projects. <br /> mitigated to satisfy the applicable City Municipal Code criterion using If noise thresholds in the Inspect site during construction <br /> appropriate housing site design. General Plan and/or to ensure compliance with <br /> Municipal Code are project construction plans. <br /> exceeded,reasonable <br /> and feasible mitigation <br /> shall be required to reduce <br /> levels to City standards. <br /> Mitigation Measure 4.C-1d: For all senior housing proposed for All sites within Developer/s of new Community Review and approve noise Prior to and after Verified by: <br /> development within the EDZ area,the City shall require noise the EDZ senior housing shall Development disclosures and noise complaint the approval of Date: <br /> disclosures and noise complaint procedures for new residents of proposed for ensure noise disclosures Department procedures prior to developer/s the development <br /> these developments,which will include 1)a disclosure of potential senior and noise complaint disseminating to senior housing of senior housing <br /> noise sources in the project vicinity;and 2)the establishment of housing procedures be residents. projects. <br /> procedures and a contact phone number for a site manager the disseminated to residents Inspect site after occupancy to <br /> residents can call to address any noise complaints. of the senior housing. ensure compliance. <br /> Johnson Drive Economic Development Zone 5-6 ESA/140421 <br /> Partial Recirculated DSEIR Response to Comments January 2020 <br />