My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS 1-2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
031621
>
13 ATTACHMENTS 1-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 1:45:16 PM
Creation date
3/12/2021 1:45:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/16/2021
DESTRUCT DATE
15Y
Document Relationships
13
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\031621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRSTCARBON `ter <br /> SOLUTIONS Proposal <br /> FCS INTERNATIONAL.INC. <br /> • Existing Conditions—Existing volumes obtained from traffic counts and the existing roadway <br /> system configuration. It is anticipated that traffic volumes for this scenario would be provided to <br /> Fehr& Peers. <br /> , Existing Plus Approved Project(EPAP) No Project Conditions—Existing volumes plus traffic <br /> estimates for approved and pending developments and/or traffic increases due to regional growth <br /> and transportation system improvements anticipated to be completed, including improvements <br /> that are conditioned on approved development projects. It is anticipated that traffic volumes for <br /> this scenario would be provided to Fehr& Peers. <br /> • Far-Term (Cumulative) No Project Conditions—Projected traffic volumes and the projected <br /> roadway system using the City of Pleasanton Travel Demand Model. <br /> Task 2: EIR Initiation <br /> Subtask 2.1: Data Gathering and Document Review <br /> The Project Team will obtain and review relevant documents from the City and other agencies.These <br /> documents will include the General Plan Land Use Element, zoning regulations, and regional growth <br /> forecast. Any proposed amendments to land use patterns or infrastructure plans will also be reviewed in <br /> preparation for the project kick-off meeting. <br /> It is assumed that City staff will assist the consultant team with collection of any relevant data, reports, <br /> studies, and plans. If needed for the project, it is assumed that City staff will also provide the consultant <br /> team with GIS data. <br /> Subtask 2.2: Project Kick-off Meeting <br /> Following the initial review of relevant materials, FCS's Project Manager and other key Project Team <br /> members will meet(via teleconference)with City staff in Pleasanton for a kick-off meeting to introduce <br /> the proposed project, clarify the Scope of Work/process, establish methods of communication, refine <br /> the project schedule,and identify key contacts. At this meeting we will review the project objectives,the <br /> approach to the analysis,and the Scope of Work. <br /> Deliverables <br /> • Kick-off meeting with City staff <br /> • Revised Scope of Work and schedule <br /> Subtask 2.3: Preparation of Comprehensive Project Description <br /> The City and LWC will identify criteria to be used to select and rank specific sites for inclusion in the <br /> Housing Element, including options/alternatives to be considered with respect to sites selection,such as <br /> assumed density ranges, housing types, and geographic diversity.After the City and LWC help to narrow <br /> potential inventory sites that are suitable for residential development, including vacant sites and sites <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 4 <br /> FI RSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.