Laserfiche WebLink
FIRSTCARBON Letter <br /> SOLUTIONS Proposal <br /> FCS INTERNATIONAL.INC <br /> • Public Scoping Meeting facilitation <br /> • Meeting materials and handouts <br /> • Summary report of scoping comments <br /> Task 4: Preparation of Administrative and Screencheck Draft Program EIR <br /> Administrative Draft Program EIR <br /> FCS will prepare the Administrative Draft Program EIR in accordance with the applicable requirements <br /> contained in CEQA Guidelines Sections 15120 through 15132.The Administrative Draft Program EIR will <br /> contain analyses related to the development of the identified housing sites and be supported by graphics <br /> and tables.The analysis will address all significant environmental issues identified during the NOP <br /> scoping period by responsible and trustee agencies, and the public.The document will identify <br /> potentially significant project-level and cumulative-level impacts,feasible mitigation measures,and the <br /> residual significance after mitigation has been implemented.The contents of the Administrative Draft <br /> Program EIR is as follows: <br /> • Executive Summary • Mineral Resources <br /> • Introduction • Noise <br /> * Project Description • Population and Housing <br /> • Environmental Impact Analysis • Public Services <br /> • Aesthetics • Recreation <br /> • Agriculture and Forestry Resources • Transportation <br /> • Air Quality • Tribal Cultural Resources <br /> • Biological Resources • Utilities and Service Systems <br /> • Cultural Resources • Wildfire <br /> • Energy • Cumulative Effects <br /> • Geology and Soils • Effects Found not to be Significant <br /> • Greenhouse Emissions • Other CEQA-Mandated Considerations <br /> • Hazards and Hazardous Materials • Alternatives to the Proposed Project <br /> • Hydrology and Water Quality • Persons and Organizations Consulted <br /> • Land Use and Planning • List of Preparers <br /> * Noise • Technical Appendices <br /> Deliverable <br /> • Electronic version (via Dropbox in Microsoft Word and PDF)of the Administrative Draft Program <br /> EIR (with technical studies) appended to the Administrative Draft Program EIR to the City.This <br /> Scope of Work assumes no hard copies of the Administrative Draft Program EIR will be provided. If <br /> hard copies are requested, a change order may be required to cover costs of producing the copies. <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 6 <br /> FIRSTCARBONSOLUTIONS.COM <br />