My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS 1-2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
031621
>
13 ATTACHMENTS 1-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 1:45:16 PM
Creation date
3/12/2021 1:45:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/16/2021
DESTRUCT DATE
15Y
Document Relationships
13
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\031621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _1141111 <br /> FI RSTCAR B O N Letter <br /> SOLUTIONS Proposal <br /> FCS INTERNATIONAL,INC. <br /> • Final Community Concerns Document (LOS analysis) <br /> • Response to public comments on Draft Program EIR <br /> The TIA will be appended to the CEQA document and will be used to draft the Transportation section of <br /> the Program EIR.The Community Concerns Document will be provided to the City, but will not be part of <br /> the CEQA document. <br /> This Scope of Work assumes that only minor editorial comments are received on each Draft report. Fehr <br /> & Peers has budgeted 20 staff hours to prepare the final reports.As the number and complexity of public <br /> comments on the Draft Program EIR is unknown, Fehr&Peers has budgeted 8 hours to review. Should <br /> the number of comments and their complexity exceed 8 hours of effort, a budget amendment would be <br /> prepared for City approval. <br /> Subtask 4.5.5: Meetings <br /> This Scope of Work assumes Fehr& Peers attendance at one meeting with City staff and one public <br /> hearing. Fehr&Peers will be available to attend additional meetings on a time-and-materials basis. <br /> Subtask 4.6: Water Supply Assessment (Watearth) <br /> As a subconsultant to FCS,Watearth will prepare the Water Supply Assessment(WSA) in support of <br /> California Environmental Quality Act (CEQA) compliance for the City's Housing Element Update,which <br /> will include the following tasks: <br /> Evaluate Data <br /> • Planning documents <br /> • SB 610 Requirements <br /> • Groundwater basins <br /> • Reservoir water supply <br /> • Historical and projected precipitation <br /> • Alternative water supply(reclaimed, reuse,greywater, purchased water) <br /> • City's 2015 Urban Water Management Plan,dated June 2016 <br /> • State regulations <br /> Senate Bill 610 Compliant WSA <br /> • Develop Water Supply: Provide a detailed documentation of water supply to the City. Analysis will <br /> account for water source type (surface vs. groundwater),water source location (specific reservoir, <br /> stream or groundwater basin), potable versus non-potable water supply, and land use (e.g., <br /> agricultural, housing, etc.). <br /> a Assess 2015 UWMP Water Supply Conservation Measures: Quantify and incorporate proposed <br /> water conservation measures identified in the City's 2015 Urban Water Management Plan, dated <br /> June 2016. <br /> 14 <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA f ASIA <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.