My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS 1-2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
031621
>
13 ATTACHMENTS 1-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 1:45:16 PM
Creation date
3/12/2021 1:45:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/16/2021
DESTRUCT DATE
15Y
Document Relationships
13
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\031621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRSTCARBON Letter <br /> SOLUTIONS Proposal <br /> FCS INTERNATIONAL,INC. <br /> a Develop SB 610 Compliant Average Annual Demand Analysis: Document existing and projected <br /> water demands based on water supply source (reservoirs,groundwater basin, etc.) and land use <br /> (e.g., agricultural, housing, etc.). Provide a baseline year and projection analyses for an average <br /> year,a single dry year,and multiple dry years per SB 610 guidelines.Account for proposed water <br /> conservation. <br /> Draft Technical Memorandum <br /> a Prepare Draft SB 610 WSA: Prepare draft WSA detailing data evaluation and recommendations <br /> and documenting process, including exhibits and graphics. <br /> • Prepare Final SB 610 WSA: Prepare the final WSA incorporating one round of City comments. <br /> Deliverables <br /> • Electronic version (via Dropbox)of the draft Water Supply Assessment <br /> a Electronic version (via Dropbox)of final Water Supply Assessment <br /> Task 5: Preparation of Public Review Draft Program EIR <br /> Upon receipt of final City staff comments on the Screencheck Draft Program EIR, FCS will proceed with <br /> finalizing and producing the Draft Program EIR for public review.This task assumes technical staff time to <br /> complete revisions to the Draft Program EIR, plus editing and administrative staff time to prepare the <br /> document for publication. We assume that all City staff comments will be consolidated into one <br /> document before delivery to FCS. <br /> FCS will prepare, and City staff will distribute, copies of the Draft Program EIR to responsible agencies <br /> and the public for a 45-day public review period. FCS will provide an electronic version (via CEQAnet)of <br /> the Notice of Completion (NOC)and Governor's Office of Planning and Research (OPR's)summary form <br /> and the Draft Program EIR,technical appendices, NOC, NOA, in accordance with OPR's CEQA Submission <br /> requirements. The State Clearinghouse (SCH)will distribute the Draft Program EIR to state agencies. <br /> Submittal of the Draft Program EIR to the SCH will formally commence the 45-day review period.This <br /> Scope of Work assumes that City staff will prepare the Notice of Availability(NOA)and be responsible for <br /> local distribution and noticing, including, but not limited to, newspaper noticing or radius mailing. <br /> Deliverables <br /> a Electronic version (via Dropbox)of the Draft Program EIR to the City.The Draft Program EIR will be <br /> provided in searchable PDF format. <br /> a Ten hard copies of the Draft Program EIR (with appendices on CD)to the City. If additional copies <br /> are requested, a change order may be required to cover costs of producing the additional copies. <br /> a Electronic version (via CEQAnet)of the Draft Program EIR,technical appendices, NOC, NOA, and <br /> OPR's summary form in accordance with OPR's CEQA Submission requirements. <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 15 <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.