My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS 1-2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
031621
>
13 ATTACHMENTS 1-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 1:45:16 PM
Creation date
3/12/2021 1:45:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/16/2021
DESTRUCT DATE
15Y
Document Relationships
13
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\031621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRSTCARBON Letter <br /> SOLUTIONS Proposal <br /> FCS INTERNATIONAL,INC. <br /> Final Program EIR <br /> Once City staff provides final comments on the Screencheck Final Program EIR, FCS will proceed with <br /> finalizing and producing the Final Program EIR.This task assumes technical staff time will be required to <br /> complete revisions to the Final Program EIR, plus editing and administrative staff time to prepare the <br /> document for publication. If additional hours are required, we will prepare a budget augment to cover <br /> the actual level of effort. <br /> FCS will provide copies of the Final Program HR to the City,who will be responsible for local distribution, <br /> noticing, and posting. FCS will also prepare the Notice of Determination (NOD)for the project,which the <br /> City will file, within 5 business days of EIR certification.This Scope of Work assumes that City staff will <br /> prepare and mail all notices associated with the Final EIR to local agencies and interested parties. <br /> Deliverables <br /> • Electronic version (in PDF via Dropbox) of the Final Program EIR to the City. <br /> * This Scope of Work assumes 5 hard copies of the Final Program EIR will be provided to the City. If <br /> additional hard copies are requested, a change order may be required to cover costs of producing <br /> the copies. <br /> • An electronic version of the NOD to the County <br /> Mitigation Monitoring and Reporting Program <br /> Pursuant to CEQA Guidelines Section 15097, FCS will also prepare a comprehensive Mitigation <br /> Monitoring and Reporting Program (MMRP).The MMRP will contain all mitigation measures identified in <br /> the Program EIR.This comprehensive MMRP will provide City staff with a single source of reference to <br /> the full range of mitigation measures to be implemented. For each measure or group of similar <br /> measures,the agency responsible for ensuring proper implementation will be identified, along with the <br /> timing and method of verification. Copies of the MMRP will be included in the Final EIR submittal. <br /> Deliverable <br /> • Electronic version (in PDF via Dropbox)of the MMRP to the City <br /> Task 7: Administration, Meetings, and Project Management <br /> Subtask 7.1: Notices and Filings <br /> Throughout the process, FCS will prepare the necessary notices and filings, including the NOP, NOC,and <br /> Notice of Determination (NOD)for the City to distribute. As described above,this Scope of Work <br /> assumes that the City will prepare the NOA. Pursuant to CEQA Guidelines Sections 15075 and 15094,the <br /> City would be responsible for filing the NOD with the Alameda County Clerk's Office within 5 business <br /> days of EIR certification. City staff will be responsible for paying the associated filing fees. In addition,the <br /> City will be responsible for any other filing fees,costs of distribution, and advertisements. <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 17 <br /> FI RSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.