Laserfiche WebLink
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 115 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />The closest residential receptor to the project site is the multi-family residential home located <br />northeast of the project site on Stoneridge Mall Road. The façade of this residence would be located <br />approximately 240 feet from the footprint of construction activity where heavy construction <br />equipment would operate during site preparation of the proposed project site. At this distance, <br />groundborne vibration levels would attenuate to 0.003 in/sec PPV from the operation of a small <br />vibratory roller. This is well below the industry standard vibration damage criteria of 0.2 in/sec PPV <br />for this type of structure, a building of non-engineer timber and masonry construction. <br />Therefore, project construction activities would not generate groundborne vibration or groundborne <br />noise levels in excess of the FTA impact assessment criteria for construction-related groundborne <br />vibration. Therefore, construction-related groundborne vibration impacts to existing off-site <br />receptors would be less than significant. <br />Operational Vibration Impacts <br />Implementation of the proposed project would not include any permanent sources that would <br />expose persons in the project vicinity to groundborne vibration levels that could be perceptible <br />without instruments at any existing sensitive land use in the project vicinity. Therefore, project <br />operational activities would not generate excessive groundborne vibration levels as measured at off- <br />site receptors, and the impact would be less than significant. <br />In addition, there are no existing significant permanent sources of groundborne vibration in the <br />project vicinity to which the proposed project would be exposed. <br />c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where <br />such a plan has not been adopted, within two miles of a public airport or public use airport, <br />would the project expose people residing or working in the project area to excessive noise <br />levels? <br />No impact. The nearest airport to the project site is the Livermore Municipal Airport, located <br />approximately 5 miles east of the project site. Because of the distance to the project site and the <br />orientation of the airport runways, the project site is located outside of the airport’s 60 dBA CNEL <br />airport noise contours. The project site is not located within the vicinity of a private airstrip. While <br />aircraft noise is occasionally audible on the project site from aircraft flyovers, aircraft noise <br />associated with nearby airport activity would not expose people working at the project site to <br />excessive noise levels. No impact would occur. <br />Mitigation Measures <br />MM NOI-1 Implementation of the following multi-part mitigation measure is required to reduce <br />potential construction period noise impacts: <br />• The construction contractor shall ensure that all equipment driven by internal <br />combustion engines shall be equipped with mufflers, which are in good condition <br />and appropriate for the equipment. <br />• The construction contractor shall ensure that unnecessary idling of internal <br />combustion engines (i.e., idling in excess of 5 minutes) is prohibited.