Laserfiche WebLink
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 131 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />spillback. The traffic signal at Springdale Avenue at Stoneridge Drive shall be <br />reprogrammed to provide conditional southbound left-turn phasing which could <br />serve the southbound left-turn movement twice per cycle during the PM peak hour; <br />however, these timings shall consider the eastbound through movement queue on <br />eastbound Stoneridge Drive extending from Stoneridge Mall Road. Implementation <br />of the improved southbound left turn phasing shall necessitate modifications to the <br />geometry and median on the south leg of the intersection to allow for concurrent <br />northbound and southbound left turns. Operations at this intersection shall be <br />monitored between project Phases 1 and 2 to determine the appropriate level of <br />signal timing modifications and improvements necessary to eliminate queue <br />overflow issues. <br />The Applicant shall contribute fair share funding towards improvements under <br />construction at Stoneridge Drive at Stoneridge Mall Road intersection to extend the <br />southbound left turn storage. <br />MM TRANS-3 The Applicant shall coordinate with the City of Pleasanton to develop a bicycle <br />facility concept for Stoneridge Drive between the I-680 southbound ramps and <br />Foothill Road that considers intersection treatments and access to bicycle facilities <br />on Stoneridge Mall Road that would connect to the BART station. The Applicant shall <br />construct the identified improvements along the project frontage and at the <br />intersections of Springdale Avenue and Stoneridge Mall Road. This concept shall be <br />consistent with the 2018 City of Pleasanton Bicycle and Pedestrian Master Plan, <br />which identified construction of buffered bike lanes in the near-term and separated <br />bikeways in the long-term. To the extent feasible, the long-term improvements shall <br />be constructed along the project frontage. Furthermore, the Applicant shall <br />contribute to the construction of a Class IV facility on the eastside of Stoneridge Mall <br />Road connecting Stoneridge Drive to the West Pleasanton BART Station. The <br />Applicant shall construct bicycle and pedestrian improvements at the intersection of <br />Stoneridge Mall Road at Fabian Court to improve access to the project site to/from <br />the BART station. A Class IV facility shall construct along the south side of Stoneridge <br />Mall Road from Springdale Avenue to Fabian Court. Bicycle and pedestrian <br />improvements shall be constructed at the intersection of Springdale Avenue and <br />Stoneridge Mall Road to provide safe and convenient access for nonmotorized travel <br />across the intersection’s’ southern approach. <br />MM TRANS-4 The Applicant shall provide emergency vehicle turning movement analysis that <br />demonstrates the ability of a standard LPFD fire truck to maneuver through project <br />site.