My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />132 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />Environmental Issues <br />Potentially <br />Significant <br />Impact <br />Less than <br />Significant <br />Impact with <br />Mitigation <br />Incorporated <br />Less than <br />Significant <br />Impact <br />No <br />Impact <br />2.18 Utilities and Service Systems <br />Would the project: <br />a) Require or result in the relocation or <br />construction of new or expanded water, <br />wastewater treatment or stormwater drainage, <br />electric power, natural gas, or <br />telecommunications facilities, the construction <br />or relocation of which could cause significant <br />environmental effects? <br /> <br />b) Have sufficient water supplies available to <br />serve the project and reasonably foreseeable <br />future development during normal, dry and <br />multiple dry years? <br /> <br />c) Result in a determination by the wastewater <br />treatment provider which serves or may serve <br />the project that it has adequate capacity to <br />serve the project’s projected demand in <br />addition to the provider’s existing <br />commitments? <br /> <br />d) Generate solid waste in excess of State or local <br />standards, or in excess of the capacity of local <br />infrastructure, or otherwise impair the <br />attainment of solid waste reduction goals? <br /> <br />e) Comply with federal, State, and local <br />management and reduction statutes and <br />regulations related to solid waste? <br /> <br /> <br />Environmental Evaluation <br />Setting <br />The information in this section is based on the City of Pleasanton Urban Water Management Plan <br />(UWMP) and the Zone 7 UWMP.109, 110 <br />Would the project: <br /> <br />109 City of Pleasanton. 2016. 2015 Urban Water Management Plan. May. Website: <br />https://www.cityofpleasantonca.gov/civica/inc/displayblobpdf.asp?blobID=27835. Accessed March 13, 2021. <br />110 Alameda County Flood Control and Water Conservation District - Zone 7 Water Agency Staff. 2016. 2015 Urban Water Management <br />Plan. February 4. Website: http://www.zone7water.com/images/pdf_docs/water_supply/2-4-16_draft-uwmp-w-appdcs.pdf. <br />Accessed March 13, 2021.
The URL can be used to link to this page
Your browser does not support the video tag.