Laserfiche WebLink
City of Pleasanton 10x Genomics Project Mitigation Monitoring and Reporting Program   FirstCarbon Solutions 13 https://adecinnovations.sharepoint.com/sites/ESSite/Shared Documents/ES/Active Projects/2148 City of Pleasanton/0024 10x Genomics/DOCUMENTS/01‐ ISMND/05 ‐ MMRP/21480024 10x Genomics MMRP.docx Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial is directed away from adjacent residences.  The construction contractor shall ensure that the construction staging areas shall be located to create the greatest feasible distance between the staging area and noise‐sensitive receptors nearest the project site.  The construction contractor shall ensure that construction activities not occur between the hours of 8:00 p.m. and 8:00 a.m. Monday through Saturday, and between the hours of 6:00 p.m. and 10:00 a.m. Sunday and holidays.   The construction contractor shall ensure that no individual piece of equipment shall produce a noise level exceeding 83 dBA at a distance of 25 feet. 2.17. Transportation MM TRANS‐1: The Applicant shall modify the intersection of Stoneridge Drive at Springdale Avenue to convert the existing southbound through and left turn lane into a left turn only lane and convert the southbound right turn only lane into a through and right turn lane. In addition, the eastbound left turn pocket shall be required to be extended to provide 200 feet of vehicle storage. The Applicant shall install a conduit for a future traffic signal at the intersection of Springdale Avenue at the Project Driveway for Phase 1 of the proposed project. The City’s Traffic Engineering Division shall monitor delays and queuing at the intersection. The installation of a traffic signal by the Applicant in conjunction with the City shall be required prior to the buildout of Phase 2. Review notes on construction plans; confirm submittal of documentation; conduct monitoring   During project construction City of Pleasanton    MM TRANS‐2: The City’s Traffic Engineering Division shall monitor and manage traffic signal timings on Stoneridge Mall Road Drive between Stoneridge Mall Road and Springdale Avenue Foothill Road and I‐680 Northbound ramps to better coordinate travel flows through the corridor and minimize vehicle queue spillback. This requirement includes any necessary upgrading of traffic signal controller equipment Review notes on construction plans; confirm submittal of documentation; conduct monitoring   Between project Phases 1 and 2 City of Pleasanton