My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton 10x Genomics Project Mitigation Monitoring and Reporting Program FirstCarbon Solutions 13 https://adecinnovations.sharepoint.com/sites/ESSite/Shared Documents/ES/Active Projects/2148 City of Pleasanton/0024 10x Genomics/DOCUMENTS/01‐ ISMND/05 ‐ MMRP/21480024 10x Genomics MMRP.docx Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial is directed away from adjacent residences. The construction contractor shall ensure that the construction staging areas shall be located to create the greatest feasible distance between the staging area and noise‐sensitive receptors nearest the project site. The construction contractor shall ensure that construction activities not occur between the hours of 8:00 p.m. and 8:00 a.m. Monday through Saturday, and between the hours of 6:00 p.m. and 10:00 a.m. Sunday and holidays. The construction contractor shall ensure that no individual piece of equipment shall produce a noise level exceeding 83 dBA at a distance of 25 feet. 2.17. Transportation MM TRANS‐1: The Applicant shall modify the intersection of Stoneridge Drive at Springdale Avenue to convert the existing southbound through and left turn lane into a left turn only lane and convert the southbound right turn only lane into a through and right turn lane. In addition, the eastbound left turn pocket shall be required to be extended to provide 200 feet of vehicle storage. The Applicant shall install a conduit for a future traffic signal at the intersection of Springdale Avenue at the Project Driveway for Phase 1 of the proposed project. The City’s Traffic Engineering Division shall monitor delays and queuing at the intersection. The installation of a traffic signal by the Applicant in conjunction with the City shall be required prior to the buildout of Phase 2. Review notes on construction plans; confirm submittal of documentation; conduct monitoring During project construction City of Pleasanton MM TRANS‐2: The City’s Traffic Engineering Division shall monitor and manage traffic signal timings on Stoneridge Mall Road Drive between Stoneridge Mall Road and Springdale Avenue Foothill Road and I‐680 Northbound ramps to better coordinate travel flows through the corridor and minimize vehicle queue spillback. This requirement includes any necessary upgrading of traffic signal controller equipment Review notes on construction plans; confirm submittal of documentation; conduct monitoring Between project Phases 1 and 2 City of Pleasanton
The URL can be used to link to this page
Your browser does not support the video tag.