Laserfiche WebLink
Ritter stated the dome height seemed appropriate and the massing was much less than the <br /> Orthodox Church in Oakland. He stated he liked the trash enclosure design and layout. <br /> Commission Nibert stated the circulation, trash enclosure, and delivery area were acceptable. <br /> He asked about the phasing of construction and location of utilities. Ms. Hagen stated the <br /> undergrounding would be between the east and west property lines. She stated the <br /> improvement plan and grading were Phase 1, the Sanctuary building was Phase 2, and the <br /> Community Building was Phase 3a, b, and c. <br /> Chair Brown expressed his agreement with the elements noted in Discussion Point #2. <br /> Discussion Point #3 <br /> 3. Is the tree removal and proposed landscaping along Dublin Canyon Road appropriate? <br /> Chair Brown asked if the utilities could be undergrounded without disturbing the existing trees. <br /> Ms. Hagen stated efforts would be made to retain trees, but the plan was not yet finalized. <br /> Commissioner Allen asked about the tree species being proposed to replace the trees along <br /> Dublin Canyon Road and the height at five years. Ms. Hagen stated Red Maple would be <br /> planted and that staff would work with the landscape architect to ensure lush trees. <br /> Commissioner Allen stated she was looking for good screening around the Community Center <br /> and parking lot. In response to Chair Brown, Mr. Tassano confirmed the existing short, bushy <br /> trees would most likely be removed. <br /> Commissioner Gaidos stated his preference to retain as many oak trees as possible. He <br /> suggested the pathway meander around the trees, although he did not anticipate a large <br /> pedestrian presence due to traffic. <br /> Commissioner Pace commended efforts to retain trees and replace any removed with heritage <br /> trees. <br /> Commissioner Ritter agreed with Commissioners Gaidos and Pace. <br /> Commissioner Nibert stated the arborist report indicated a number of trees with severe injuries <br /> and asked if the heritage trees would be removed or saved. Ms. Hagen stated the City's <br /> landscape architect would work with the project team to determine the trees to be preserved. <br /> Commissioner Nibert then asked about trees to be removed due to construction conflicts. Ms. <br /> Hagen explained the trees to be removed in the small area on the southwest corner for the <br /> new driveway and emergency access lane. In response to Commissioner Nibert, Ms. Hagen <br /> explained the trees in the riparian area were being removed for health and safety reasons. <br /> Discussion Point #4 <br /> 4. a) Does the Planning Commission support the proposed building architecture and <br /> detailing, design, colors, and materials? <br /> b) Does the Planning Commission support the proposed building and dome heights? <br /> Chair Brown asked about Staff's concerns with the buildings being over 30 feet. Ms. Hagen <br /> explained that staff would like all buildings, with the exception of the dome, to be consistent <br /> Excerpt Approved Planning Commission Minutes, April 14; 2021 Page 4 of 5 <br />ly 45 feet between the home and the church building. She <br /> stated the sanctuary building and dome would be approximately 200 feet from the property <br /> line. Commissioner Pace asked the visual impacts and potential privacy issues. Ms. Hagen <br /> explained there were no second story windows on the west side of the building that would <br /> provide views of adjacent properties. <br /> Excerpt: Approved Planning Commission Minutes, April 14, 2021 Page 1 of 5 <br />e type, location, and sizing calculations of the <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 16 of 25 <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 3 of 25 <br />YCROSSCRISFIELD .*- 4-; -,47÷-'' 1.1--1 ''.-. HAM <br /> ;-----fk;s7,4G <br /> il <br /> 3` <br /> • kst • .7 <br /> I DIJNIYA1:1%, ..4.. ,i4is' '1 , „J 10 ,,,... <br /> ‘1 'kTIAV - 1) \ ‘ ' ?) $.Y \t, ,2:2/ <br /> \ ‘ 111-,-,: . <br /> ,..... i ..., i <br /> 1:11,343 <br /> o 0.125 0.25 mi PUD-140, Townsend, Lot Line, 2207 Martin Ave Planning Division =-- -.• .-.... , 1:16 <br /> I i II May 10,2021 FLEA:.,ANTON. <br /> 0 650 1,300 Feet <br />