My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
110221
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 2:59:07 PM
Creation date
10/27/2021 2:31:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/2/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAP 2.0 Action Quantification Outcomes <br />Summary At -a -Glance <br />BE <br />1001 <br />Comm. <br />Community <br />NPV <br />Net present value <br />Net current value of all current and future cash flows <br />1164V <br />Existing Building <br />associated with the project; takes into account both <br />$7,843 <br />Electrification Plan <br />costs and cost savings (i.e., benefits). Negative values <br />1169 <br />Refrigerant <br />are a net cost savings. <br />GHG <br />Greenhouse gas <br />Methane, carbon dioxide, and nitrous oxides that <br />� O <br />new construction <br />contribute to climate change <br />MTCO2e <br />Metric tons carbon dioxide equivalent <br />Common unit for quantifying GHG emissions <br />(�- <br />Denotes actions with notable direct or indirect GHG savings that were not quantified due to <br />� O <br />measurement constraints. <br />BE <br />1001 <br />All -electric reach <br />$137,032 <br />$42,675 <br />code <br />BE <br />1164V <br />Existing Building <br />-$1,959,201 <br />$7,843 <br />Electrification Plan <br />BE <br />1169 <br />Refrigerant <br />O <br />1,290 <br />management in <br />$223 <br />� O <br />new construction <br />BE <br />1217 <br />Modify Municipal <br />227 <br />$34 <br />Code definition of <br />� O <br />351 <br />covered projects <br />BE <br />1176 <br />Community energy <br />efficiency upgrades <br />BE <br />1167 <br />LEED certification <br />O <br />for new <br />manr <br />construction <br />BE <br />1008 <br />Energy <br />Benchmarking and <br />r <br />118,182 <br />City Facility <br />$0 <br />• <br />O r QiQ <br />Retrofits <br />BE <br />1119 <br />Zero emissions <br />energy as default <br />EBCE choice' <br />BE <br />1163 <br />Solar & storage on <br />new construction <br />T&LU <br />1056 <br />ZEV Infrastructure <br />Plan <br />T&LU <br />1190 <br />Municipal small - <br />engine <br />electrification and <br />off-road equipment <br />1 EBCE = East Bay Community Energy <br />N <br />CASCADIA <br />CONSULTING GROUP <br />$49,020 <br />-$2,784,572 <br />$138,455 <br />$137,032 <br />$42,675 <br />-$262,307 <br />$0 <br />$287,074 <br />$958,041 <br />-$1,959,201 <br />$7,843 <br />-$180,389 <br />-$3,103,111 <br />$0 <br />$0 $20,919,524 <br />$0 $0 <br />$203,263 -$24,556 <br />$0 $0 <br />11,615 <br />$4 <br />-$240 <br />O r <br />16,511 <br />$8 <br />$8 <br />r <br />�- <br />N/A <br />N/A <br />O <br />1,290 <br />$0 <br />$223 <br />� O <br />26,041 <br />$37 <br />-$75 <br />227 <br />$34 <br />-$793 <br />� O <br />351 <br />-$8,833 <br />$0 <br />dam <br />r <br />277,840 <br />$0 <br />$75 <br />O <br />manr <br />244 <br />$0 <br />$0 <br />r <br />118,182 <br />$2 <br />$0 <br />• <br />O r QiQ <br />N/A <br />N/A <br />O <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.