Laserfiche WebLink
CAP 2.0 Action Quantification Outcomes <br />Table 5. Net present value (NPV) net cost estimates for CAP 2.0 action implementation (through 2031). <br />N <br />CASCADIA Page 15 <br />CONSULTING GROUP <br />NPV Costs <br />BE <br />1001 <br />All -electric reach code <br />$49,020 <br />-$2,784,572 <br />BE <br />1164V <br />Existing Building Electrification Plan <br />$138,455 <br />$137,032 <br />BE <br />1169 <br />Refrigerant management in new construction <br />$42,675 <br />-$262,307 <br />BE <br />1217 <br />Modify Municipal Code definition of covered projects <br />$0 <br />$287,074 <br />BE <br />1176 <br />Community energy efficiency upgrades <br />$958,041 <br />-$1,959,201 <br />BE <br />1167 <br />LEED certification for new construction <br />$7,843 <br />-$180,389 <br />BE <br />1008 <br />Energy Benchmarking and City Facility Retrofits <br />($3,103,111) <br />$0 <br />BE <br />1119 <br />Zero emissions energy as default East Bay Community Energy <br />$0 <br />$20,919,524 <br />(EBCE) choice <br />BE <br />1163 <br />Solar and storage on new construction <br />$0 <br />$0 <br />T&LU <br />1056 <br />ZEV Infrastructure Plan <br />$203,263 <br />-$24,556 <br />T&LU <br />1190 <br />Municipal small -engine electrification and off-road equipment <br />$0 <br />$0 <br />T&LU <br />1115 <br />Community Small -engine electrification <br />$0 <br />-$2,448,960 <br />T&LU <br />1082 <br />Bicycle, pedestrian, and trails network expansion <br />$13,108,964 <br />-$3,800,771 <br />T&LU <br />1078 <br />Workplace bike amenities <br />$0 <br />$2,593,114 <br />T&LU <br />1080 <br />Bicycle rack incentive program <br />$7,562 <br />-$730,532 <br />T&LU <br />1079 <br />Required bike parking at MF/Comm developments <br />$0 <br />-$35,260 <br />T&LU <br />1070 <br />Increase active transportation <br />$0 <br />-$392,340 <br />T&LU <br />1180 <br />Increase transit ridership <br />$75,384 <br />-$1,277,220 <br />T&LU <br />1184 <br />VMT reduction for K-12 activities <br />$571,058 <br />-$6,365,308 <br />T&LU <br />1159 <br />Shared parking <br />$0 <br />$0 <br />T&LU <br />1230 <br />Housing Element <br />$39,719 <br />-$11,150,518 <br />T&LU <br />1227 <br />Trend changes from COVID <br />$0 <br />$0 <br />T&LU <br />1086 <br />Promote LEED Neighborhood Development <br />$910 <br />-$850,666 <br />M&C <br />1229 <br />Textile recovery <br />$0 <br />$0 <br />M&C <br />1194 <br />Single use plastic reduction <br />$0 <br />$0 <br />M&C <br />1047 <br />Environmentally preferable purchasing policy <br />$0 <br />$0 <br />M&C <br />1126 <br />Collaborative consumption <br />$297,774 <br />-$190,934 <br />M&C <br />1137 <br />Repair Industry <br />$24,857 <br />-$37,659 <br />M&C <br />1198 <br />Embodied carbon reduction plan <br />$0 <br />-$88,625 <br />NS <br />1150 <br />Urban Forest Master Plan <br />$486,089 <br />$469,585 <br />NS <br />1219 <br />Soil management carbon sequestration projects <br />$34,711 <br />$2,868,511 <br />NS <br />1220 <br />Carbon sequestration research and tracking <br />$0 <br />$0 <br />NS <br />1145 <br />Climate adapted plantings <br />$0 <br />$0 <br />NS <br />1099 <br />Restore and conserve native grassland, rangeland, and riparian <br />$1,280,236 <br />$0 <br />habitats <br />NS <br />1204 <br />Community conservation programs <br />$0 <br />$0 <br />WR <br />1087 <br />Water fixture retrofits <br />$220,588 <br />-$2,942,142 <br />WR <br />1094 <br />Expand recycled water <br />$5,177,842 <br />$0 <br />WR <br />1147 <br />Water Efficiency Programs <br />$1,414,038 <br />-$1,708,155 <br />WR <br />1092 <br />Stormwater runoff reuse <br />($400,570) <br />-$113,123 <br />WR <br />1136 <br />Green Stormwater Infrastructure Plan <br />$0 <br />$0 <br />WR <br />1199 <br />On-site stormwater management <br />$0 <br />$0 <br />CRW <br />1026 <br />Neighborhood resilience hubs <br />$369,290 <br />$0 <br />CRW <br />1143 <br />Community gardens <br />$115,355 <br />$0 <br />CRW <br />1130 <br />CalFresh, WIC & Senior FMNP expansion <br />$0 <br />$0 <br />CRW <br />1010 <br />Reduce heat island effect <br />$0 <br />$80,022 <br />CRW <br />1096 <br />Wildfire preparation, prevention, and education <br />$0 <br />$0 <br />CRW <br />1216 <br />Institutionalize climate action <br />$1,991,951 <br />$0 <br />CRW <br />1032 <br />Prioritize adaptation and resilience in capital projects <br />$46,192 <br />$0 <br />CRW <br />1038 <br />Critical facility relocation <br />$138,577 <br />$0 <br />CRW <br />1023 <br />Comprehensive climate outreach <br />$64,521 <br />$0 <br />CRW <br />1228 <br />Sustainability Awards <br />$4,981 <br />$0 <br />CRW <br />1151 <br />Update CAP checklist <br />$49,020 <br />$0 <br />TOTAL <br />$23,415,234 <br />-$9,988,378 <br />N <br />CASCADIA Page 15 <br />CONSULTING GROUP <br />