My WebLink
|
Help
|
About
|
Sign Out
SOUTHERN PACIFIC - FT 034165
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SOUTHERN PACIFIC - FT 034165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:59:12 PM
Creation date
11/4/2021 3:57:03 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/23/1982
LONG TERM AGREEMENTS - NAME
SOUTHERN PACIFIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' . a <br />6. Railroads will construct or cause to be constructed all tracks and <br />related facilities in permanent realignment on property, subgrade and <br />bridge structures provided by local agencies, and, subject to the limitations <br />set forth herein, at the cost of Project: <br />a. SP will remove or relocate as required, portions of its tracks <br />at Radum and East Pleasanton, as shown on said Exhibit B, Detail B. <br />Work within WP right—of—way will be performed by WP. <br />b. SP will connect the ends of its mainline track at Niles to WP <br />as shown in Detail A of Exhibit B. Work within WP right—of—way will be <br />performed by WP. <br />C. SP and WP will change or relocate signal and communication <br />facilities, and will install, relocate, or remove all grade crossing <br />warning devices. <br />d. To facilitate construction of the three underpass structures, <br />WP trains will be temporarily detoured via SP, between a point near <br />Sunol, WP Milepost 37.0, and the East Pleasanton Yard, Milepost 42.7, <br />shown on Details T—S and T—R of Exhibit B. Railroads, as part of the <br />Project expenses, shall construct temporary shoofly track connections, <br />including the subgrade and any necessary supporting structures therefor. <br />Railroads will also make temporary wiring connections so that existing <br />signals along SP main line, within the above detour limits, will function <br />as a part of WP's existing centralized traffic control system (TCS). <br />Upon completion of the three underpasses and restoration of WP track <br />thereon, said temporary connections shall be removed, as part of the <br />Project expense. Provided, however, that Railroads may at their option <br />construct the aforementioned shoofly tracks on subgrade to be constructed <br />by local agencies. <br />e. WP and SP will furnish such representatives, engineering <br />inspectors, watchmen, flagmen, and conductor and engineer pilots as <br />Railroads deem necessary to protect and safeguard property, engines, <br />trains and cars during the construction of the Project. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.