Laserfiche WebLink
Excerpt: Draft Planning Commission Minutes Page 1 of 4 December 8, 2021 <br />PUD-138 and Vesting Tentative Subdivision Map 8616, AVS Ranch <br />Applications for the approximately 112-acre vacant lot known as APN 949-16-6 / Lot 98 of <br />Happy Valley Specific Plan (HVSP) located on the east side of Alisal Street to the <br />immediate north of Faith Chapel Assembly of God of Pleasanton (which is at 6656 Alisal <br />Street) for: (1) Planned Unit Development (PUD) development plan approval for a 22-lot <br />single-family residential development on an approximately 33-acre portion of the site, <br />referred to as the Spotorno Flat by HVSP, and related on- and off-site improvements; and <br />(2) a Vesting Tentative Subdivision Map to subdivide the 112-acre parcel into 25 parcels <br />consisting of: 22 residential lots ranging in size from 44,188 square feet and 51,601 square <br />feet; two common lots owned by a future homeowners’ association; and an Open <br />Space/Agricultural parcel with a conservation easement retained by the Spotorno family. <br />Associate Planner Jenny Soo presented the specifics of the item in the Agenda Report. <br />Chair Brown commended Staff for the thorough presentation and agenda report. <br />Commissioner Nibert asked about reference to the easement in the resolution. Ms. Soo <br />explained that the easement would be dedicated to the City, with potential third party <br />maintenance, and would prohibit development on the parcel but allow the Spotorno family to <br />continue their agricultural activity in perpetuity. Commissioner Nibert then asked about the <br />earthquake fault zone, geological consultant’s recommendation to repair landslide and if the <br />consultant would review the construction plans. Ms. Soo confirmed that the same geotechnical <br />consultant would review the plans to ensure the repair was completed per the recommendation. <br />Commissioner Nibert asked if the California Salamander’s native habitat had been considered. <br />Ms. Soo stated a study was completed to determine the project impact to the salamanders and <br />the easement was established as a safe location. Director Clark explained the conclusion that <br />there was potential for the salamander to be in the area but with correct mitigation there would <br />be no impact. <br />Chair Brown asked about development of the future trails. Ms. Soo clarified that the trails would <br />be built by the applicant and maintained by the HOA. Chair Brown then asked about the four <br />way stop at Alisal Street and if a further traffic study was required. Ms. Soo stated the traffic <br />study determined a stop sign and the Traffic Division would confirm the details. Chair Brown <br />asked about traffic calming. Ms. Soo confirmed that traffic calming would be implemented on <br />new and existing streets. <br />THE PUBLIC HEARING WAS OPENED <br />Martin Inderbitzen, attorney representing the property owners, stated the project complied with <br />the HVSP and General Plan and he encouraged moving the project forward. <br />John Spotorno, property owner and project architect, discussed efforts to develop the property <br />and provided an overview of the proposed development. He requested the Planning Commission <br />approve the project. <br />Robin Boggs provided comments on Item 7 and shared her concerns about traffic and safety. <br />Deborah Insel provided comments on Item 7 and shared her concerns about traffic and safety. DRAFT