My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />112 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />site underwent contaminant remediation in 1996 and achieved regulatory closure by the California <br />Department of Toxic Substances Control (DTSC) in 2003. The latest available monitoring and <br />sampling reports indicate that perchloroethylene (PCE) concentrations have been substantially <br />reduced below cleanup level goals in groundwater samples from monitoring wells.25 Furthermore, a <br />Phase I ESA prepared for the project site did not identify any Recognized Environmental Concerns <br />(RECs) (see Appendix F). Development and operation of the proposed project would not expose <br />persons to residual hazardous materials from past uses of the project site and thus would thus not <br />create a significant hazard to the public or the environment. Implementation of MM I7 would not be <br />required. Therefore, the proposed project would not result in any peculiar effects and would not <br />result in new or more severe impacts related to hazardous materials sites beyond what was <br />previously analyzed in the 1998 HVSP FEIR. <br />e) Airports <br />Would the project: For a project located within an airport land use plan or, where such a plan has <br />not been adopted, within two miles of a public airport or public use airport, <br />would the project result in a safety hazard or excessive noise for people residing <br />or working in the project area? <br />This question was not included in the 1998 HVSP FEIR. No determination was made in the 1998 <br />HVSP FEIR regarding the significance level of impacts associated with airports or an airport land use <br />plan. <br />The project site is not located in an airport influence zone as delineated in the Livermore Municipal <br />Airport Master Plan. The project site is not within 2 miles of a public airport or public use airport. The <br />nearest airport, Livermore Municipal Airport, is roughly 4.9 miles northeast of the project site. Given <br />the distance of the project site from the nearest local airport, and applicable air traffic and safety <br />regulations, the project would result in no impact with respect to air safety hazards. Therefore, the <br />proposed project would not result in any peculiar effects and would not result in new or more severe <br />impacts related to airports beyond what was previously analyzed in the 1998 HVSP FEIR. <br />f) Emergency Response and Evacuation <br />Would the project: Impair implementation of or physically interfere with an adopted emergency <br />response plan or emergency evacuation plan? <br />This question was not included in the 1998 HVSP FEIR. No determination was made in the 1998 <br />HVSP FEIR regarding the significance level of impacts associated with implementation of an <br />emergency response plan or emergency evacuation plan. <br />According to the General Plan Safety Element, the Livermore-Pleasanton Fire Department ’s goal is to <br />respond to calls within 5 minutes 90 percent of the time. Additionally, the current best practice <br />adopted by the Fire Department is to measure total reflex time and define it as the time from the <br /> <br />25 Department of Toxic Substances Control (DTSC). n.d. Website: http://www.envirostor.dtsc.ca.gov/public/profile_report.asp?global_ <br />id=01280050. Accessed March 13, 2017.
The URL can be used to link to this page
Your browser does not support the video tag.