Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />160 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />Environmental Issues <br />CEQA Section 15183(b) Criteria <br />Prior 1998 <br />HVSP FEIR <br />Determination <br />Effect <br />Peculiar to <br />Project or <br />Site? <br />New <br />Significant <br />Effect? <br />New <br />Significant <br />Off-site, <br />Cumulative <br />Impact? <br />New <br />Information, <br />More Severe <br />Adverse <br />Impact? <br />4.18 Utilities and Service Systems <br />Would the project: <br />a) Require or result in the relocation or <br />construction of new or expanded water, <br />wastewater treatment or storm water <br />drainage, electric power, natural gas, or <br />telecommunications facilities, the <br />construction or relocation of which could <br />cause significant environmental effects? <br />Less than <br />significant <br />impact with <br />mitigation <br />incorporated <br />No No No No <br />b) Have sufficient water supplies available to <br />serve the project and reasonably <br />foreseeable future development during <br />normal, dry and multiple dry years? <br />Less than <br />significant <br />impact with <br />mitigation <br />incorporated <br />No No No No <br />c) Result in a determination by the <br />wastewater treatment provider which <br />serves or may serve the project that it has <br />adequate capacity to serve the project’s <br />projected demand in addition to the <br />provider’s existing commitments? <br />Less than <br />significant <br />No No No No <br />d) Generate solid waste in excess of State or <br />local standards, or in excess of the capacity <br />of local infrastructure, or otherwise impair <br />the attainment of solid waste reduction <br />goals? <br />None No No No No <br />e) Comply with federal, state, and local <br />management and reduction statutes and <br />regulations related to solid waste? <br />None No No No No <br /> <br />a) Water, Wastewater, and Stormwater Facilities <br />Would the project: Require or result in the relocation or construction of new or expanded water, <br />wastewater treatment or storm water drainage, electric power, natural gas, or <br />telecommunications facilities, the construction or relocation of which could <br />cause significant environmental effects? <br />Wate r <br />The 1998 HVSP FEIR determined that a water system would need to be constructed. Principal <br />activities associated with construction of the water system would be trenching and laying of pipe, <br />grading and preparing sites for installation of pump stations and water storage facilities, and <br />installation of pump stations and water storage facilities. Temporary, short-term traffic associated