My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 173 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />flooding. As discussed in Section 4.11, Hydrology and Water Quality, the City of Pleasanton’s <br />Department of Engineering determined that there does not appear to be flooding issues within the <br />Spotorno property. Furthermore, as discussed in Section 4.7, Geology and Soils, the proposed <br />project would not build residential structures within the landslide area due to the Building <br />Restriction Zone. <br />Compliance with City regulations including a City Grading and Drainage Plan, Erosion Control <br />Measures, BMPs, and the Building Restriction Zone, would reduce the risk of possible impacts <br />related to flooding and landslides. Therefore, the proposed project would not result in any peculiar <br />effects and would not result in new or more severe impacts related to flooding or landslides in a very <br />high fire hazard severity zone beyond what was previously analyzed in the 1998 HVSP FEIR. <br />FEIR Mitigation Measures <br />None. <br />Conclusion <br />No new significant impacts related to flooding and landslide hazards due to post-wildfire slope <br />instability would occur. The conclusion from the 1998 HVSP FEIR remain unchanged.
The URL can be used to link to this page
Your browser does not support the video tag.