My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 42 <br /> <br />between Contra Costa County and the City of Livermore. The installation of median barriers will eliminate <br />crossover-type collisions that resulted in fatalities in the past. <br />Status: The Phase 2 project is in the scoping stage. The Phase 2 project includes the PSR to be done by <br />Alameda County. <br />Cost and Funding Sources <br /> <br />Cost (Millions) $31.20 <br />Funding (Millions) <br />TVTDF $2.58 <br />Total Funding (Millions) $2.58 <br />Total Funding Shortfall (Millions, 2015) $28.62 <br />A -11. EXPRESS BUS/BUS RAPID TRANSIT (BRT) – PHASE 2 <br />TVTC Project Sponsor: City of Dublin <br />Lead Agency: Livermore Amador Valley Transit Authority (LAVTA) <br />Project Description: Project A-11 is Phase 2 of the Express Bus/BRT, which consists of two phases. The <br />express bus route associated with Phase 1 of the project has been operating since January 2011. <br />Phase 2 includes upgrades to and expansion of the initial Rapid Project, as well as some project <br />refinements, updates, and maintenance/replacement of original project elements and equipment based on <br />evaluation of the existing components and conditions at the time of funding. The transit system priorities <br />include the following elements: <br />• A technologically advanced transit system <br />• A multi-modal transportation system that supports the local economy <br />• Prioritized regional transfers and connections <br />• Reliability and efficiency that maximizes value to taxpayers and the community <br />Phase 2 will consist of five key potential elements (based upon conditions at time of funding): <br />1. Advanced Technology – Design and installation of advanced technologies and road features <br />allowing rapid transit to operate quickly and efficiently, and help to mitigate delay in dwell times, <br />boardings, and travel times. Some of the advanced technologies and road features that LAVTA is <br />considering for Phase 2 are: transit signal priority (TSP), enhanced stations, queue jumps, <br />environmentally friendly coaches and advanced onboard technology, advanced fare collection <br />systems, level boarding, dedicated travel lanes, and better integrated park and ride facilities and <br />transit centers. Element 1 is currently budgeted at $2 Million. <br />2. North/South Express Bus/Rapid Service – In keeping with the Alameda Countywide Transit <br />Plan, and in order to provide a strong foundation for LAVTA’s System, I-680 service expansion, <br />North/South Express Bus/BRT service, and other Express/Rapid service options, will be explored <br />and considered. Element 2 is currently budgeted at $6.5 Million. <br />3. Dublin Extension – Continued study and planning will be done on how best to integrate the <br />planned extension of Dublin Boulevard and the planned Livermore BART Extension into LAVTA’s <br />Express Bus/BRT service. Element 3 is currently budgeted at $6.5 Million.
The URL can be used to link to this page
Your browser does not support the video tag.