Laserfiche WebLink
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 56 <br /> <br />Cost and Funding Sources <br /> <br />Cost (Millions) $10.33 <br />Funding (Millions) <br />Pleasanton TIF $7.70 <br />Total Funding (Millions) $7.70 <br />Total Funding Shortfall (Millions) $2.63 <br />C-9 STONERIDGE/I-680 INTERCHANGE <br />TVTC Project Sponsor: Pleasanton <br />Project Description: This project will make modifications to the Stoneridge Drive Interchange to allow four <br />westbound through lanes. This project will modify the northbound I-680 on ramp by one lane to provide <br />two northbound ramp lanes. The widening will include the widening of the bridge structure as well as <br />widening on Stoneridge Drive and safety improvements on the pedestrian and bicycle crossing. <br />Status: PS&E <br />Cost and Funding Sources <br /> <br />Cost (Millions) $11.98 <br />Funding (Millions) <br />2014 MBB (TEPO – 26) from Alameda <br />CTC <br />$5.20 <br />Developer $2.70 <br />Total Funding (Millions) $7.70 <br />Total Funding Shortfall (Millions) $2.63 <br /> <br />C-10 INNOVATE 680 <br />TVTC Project Sponsor: CCTA/Danville/San Ramon/CCC <br />Project Description: Implement the following strategies in the I-680 corridor: <br />Strategy No. 1: Complete HOV/Express Lanes <br />Eliminate the gap in existing carpool lanes in the NB direction and convert to an express lane to increase <br />efficiency. <br />Strategy No. 2: Cool Corridor “Hot Spots” <br />Improve congestion “hot spots” caused by high-volume weaving areas around N. Main Street, Lawrence <br />Way, Treat Blvd, and other locations south of SR 24 (Livorna Road, etc.). This strategy will be completed <br />with Strategy 1 since they are interdependent. <br />Strategy No. 3: Increase Efficiency of Bus Service <br />Increase bus service efficiency by improving express bus service, implementing bus operations on shoulder <br />(BOS), and increasing technology-based intermodal transit centers/managed park and ride lots. <br />Strategy No. 4: Enhance TDM Strategies