My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 56 <br /> <br />Cost and Funding Sources <br /> <br />Cost (Millions) $10.33 <br />Funding (Millions) <br />Pleasanton TIF $7.70 <br />Total Funding (Millions) $7.70 <br />Total Funding Shortfall (Millions) $2.63 <br />C-9 STONERIDGE/I-680 INTERCHANGE <br />TVTC Project Sponsor: Pleasanton <br />Project Description: This project will make modifications to the Stoneridge Drive Interchange to allow four <br />westbound through lanes. This project will modify the northbound I-680 on ramp by one lane to provide <br />two northbound ramp lanes. The widening will include the widening of the bridge structure as well as <br />widening on Stoneridge Drive and safety improvements on the pedestrian and bicycle crossing. <br />Status: PS&E <br />Cost and Funding Sources <br /> <br />Cost (Millions) $11.98 <br />Funding (Millions) <br />2014 MBB (TEPO – 26) from Alameda <br />CTC <br />$5.20 <br />Developer $2.70 <br />Total Funding (Millions) $7.70 <br />Total Funding Shortfall (Millions) $2.63 <br /> <br />C-10 INNOVATE 680 <br />TVTC Project Sponsor: CCTA/Danville/San Ramon/CCC <br />Project Description: Implement the following strategies in the I-680 corridor: <br />Strategy No. 1: Complete HOV/Express Lanes <br />Eliminate the gap in existing carpool lanes in the NB direction and convert to an express lane to increase <br />efficiency. <br />Strategy No. 2: Cool Corridor “Hot Spots” <br />Improve congestion “hot spots” caused by high-volume weaving areas around N. Main Street, Lawrence <br />Way, Treat Blvd, and other locations south of SR 24 (Livorna Road, etc.). This strategy will be completed <br />with Strategy 1 since they are interdependent. <br />Strategy No. 3: Increase Efficiency of Bus Service <br />Increase bus service efficiency by improving express bus service, implementing bus operations on shoulder <br />(BOS), and increasing technology-based intermodal transit centers/managed park and ride lots. <br />Strategy No. 4: Enhance TDM Strategies
The URL can be used to link to this page
Your browser does not support the video tag.