Laserfiche WebLink
Tri-Valley Transportation Council │ 2020 Nexus Fee Update Study <br />August 2021 │ Final 64 <br /> <br />D. Prepare corridors around transit centers and BART stations to implement Shared Autonomous <br />Vehicles (SAVs) to improve transit connectivity to shift travelers from Single Occupancy Vehicles <br />(SOVs) to transit. <br />E. Prepare intersections around transit center and ABRT stations to accommodate the evolution of <br />Connected Vehicle applications and Autonomous Vehicle technologies for improved traffic flow by <br />building new and upgraded vehicle-to-infrastructure and vehicle-to-vehicle communications. <br />F. Test and develop standard/protocol at the intersections, through existing and new Vehicle-to- <br />Everything (V2X) and Vehicle-to-Infrastructure (V2I) technologies as a regional standard to be <br />adopted by the local agencies among the Tri-Valley Jurisdictions. These technologies will allow a <br />vehicle to communicate in real time with its surroundings. <br />G. Work with regional agencies in incorporating signal and vehicle communications in day to day <br />operations. This would include sharing of equipment and data for seamless integration of <br />connected and autonomous vehicle access across Tri-Valley Jurisdictions and freeway <br />infrastructure including express lanes. <br />The project will be implemented in phases. Phase 1 of the proposed project will comprise of a feasibility <br />study to identify potential locations, improvements, and develop cost estimates at key transit hubs, <br />along major transit routes, and at freeway access locations in tri-valley area. Phase 2 of the project will <br />further the development of the project with completion of design and Phase 3 will compete the <br />construction/implementation and operation of the proposed project. <br />Status: The project is currently not yet started. <br />Cost and Funding Sources <br />Cost (Millions) $0.33 <br />Funding (Millions) $0.00 <br />Total Funding (Millions) $0.00 <br />Total Funding Shortfall (Millions) $0.33 <br />C-16 I -680 EXPRESS BUS SERVICE <br />TVTC Project Sponsor: Alameda CTC, in partnership with CCTA <br />Project Description: This project proposes to construct capital improvements and purchase buses in order <br />to establish an express bus service on I-680. This project requires the construction of the I-680 Express <br />Lane Gap Closure project, closing the gap in the express lanes between Alcosta Blvd and State Route 84, <br />in order to utilize the express lanes to avoid congestion, reduce travel time, and improve reliably, as part of <br />an express bus service between the Tri-Valley communities and Silicon Valley. This express bus service <br />would likely be combined with and become part of similar efforts by Contra Costa Transportation Authority <br />(CCTA) and their Innovate 680 program, with the intent to serve the entire I-680 corridor extending from <br />Martinez to San Jose, utilizing buses to provide access to additional commute options, including BART, <br />Amtrak, Caltrain, VTA light rail, local bus service, and Greyhound, for those living along the corridor. <br />The service would operate weekdays only, with proposed 20-minute headways during peak periods and <br />one-hour headways during off-peak hours. The service would be bi-directional to avoid substantial <br />deadhead time and to maintain a high level of service. New electric buses would be purchased as part of <br />this project.